Foldable Spar Hull Belly Strake Installation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Spar-type floating oil and gas platforms with large diameter hulls face challenges in installing belly strakes due to limited water depth, requiring complex and costly procedures, including underwater fabrication and heavy lift vessel operations, which increase time and costs.

Innovation Solution

A foldable belly strake system for spar hulls that can be installed in a deep water pit, allowing the hull to be rotated for access, with strake panels and frames that can be folded and unfolded for transport and final positioning, reducing the need for offshore installation and heavy lift vessels.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If belly strakes are installed on spar hulls with large diameter, then vortex-induced vibrations are reduced and stability is improved, but installation complexity and cost increase due to limited water depth requirements

Engineering Contradiction:
ImprovestabilityVSAvoidinstallation complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The belly strake is divided into multiple panels that can be folded together like an accordion structure. This segmentation allows the strake to be compact during transport and then expanded to full size when installed on the spar hull, eliminating the need for complex heavy lift vessel operations while still providing the stability benefits

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The belly strake employs a foldable structure with hinges and fasteners that transitions from a compact folded state during transport to a fully extended rigid state during installation. This dynamic configuration allows the same structure to meet different operational requirements (transport vs. installation) without requiring separate systems

Inventive Principle:
Principle #15Dynamics

2Ease of manufacture

If belly strakes are installed during wet tow transport, then installation can be performed in shallow water, but the strake panels cannot be properly installed due to insufficient water depth

Engineering Contradiction:
Improveinstallation easeVSAvoidwater depth
Core Design Contradiction:
Ease of manufactureVSLength of stationary object

Solution Approach 1:

The belly strake panels are pre-assembled in a folded configuration on the quayside before the spar hull is transported to the installation site. This preliminary assembly in controlled shallow water conditions allows the structure to be prepared in advance, and then the folded strake is attached to the hull during transport without requiring deep water

Inventive Principle:
Principle #10Preliminary action

3Length of moving object

If heavy lift vessels are used for transporting spar hulls, then large diameter hulls can be transported, but installation costs and logistical complexity increase

Engineering Contradiction:
Improvehull diameterVSAvoidlogistical complexity
Core Design Contradiction:
Length of moving objectVSDevice complexity

Solution Approach 1:

By segmenting the belly strake into foldable panels, the system eliminates the need for heavy lift vessels during strake installation. The compact folded structure can be handled with standard quayside equipment, and the spar hull can be transported using conventional towing methods rather than requiring specialized heavy lift capability

Inventive Principle:
Principle #1Segmentation

Data Source

PatentUS8783198B2Spar hull belly strake design and installation method
Publication Date: 2014.07.22 TECH FRANCE SA
  • US8783198B2 patent drawing
  • US8783198B2 patent drawing
  • US8783198B2 patent drawing

AI summary

A spar hull for a floating vessel can include a hard tank having a belly portion, a fixed strake coupled to the outer surface of the tank and a folding strake coupled to the belly portion of the tank, the folding strake having one or more strake panels and one or more support frames. A method for installing folding belly strakes on a spar hull may include providing a floating spar hull having a hard tank with a belly side, rotating the spar so that the belly side is in a first workable position, coupling at least one folding strake to the belly side of the spar, and coupling the strake in a folded position for transport. The method may include positioning the spar hull offshore in a transport position, upending the spar hull, unfolding the strake, fixing the strake in the unfolded position and installing the spar hull.