Forecasting System for Dynamic Labor Scheduling

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Facilities such as distribution centers and retail stores face challenges in accurately scheduling workers due to varying demands throughout different times, days, weeks, and months, which existing systems fail to address effectively.

Innovation Solution

A forecasting system that utilizes sensors outside and inside facilities to detect data on vehicle and customer traffic, physical objects, and customer traffic, combined with historical data, to generate forecast data and a labor model indicating the required number of workers needed, dynamically updating schedules based on real-time changes.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If traditional scheduling methods are used, then scheduling simplicity is maintained, but scheduling accuracy and adaptability to varying demands deteriorate

Engineering Contradiction:
Improvescheduling accuracyVSAvoidsystem complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The system segments the scheduling problem into multiple components: demand forecasting module, sensor data collection module, historical data module, and labor model generation module. Each module handles a specific aspect of the scheduling challenge, allowing the system to achieve high accuracy through specialized sub-systems rather than a monolithic complex system.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system performs preliminary actions by collecting sensor data and historical data in advance, generating forecasts before scheduling decisions are made. The forecast module analyzes past patterns and current sensor readings to predict future demand, enabling proactive scheduling rather than reactive adjustments.

Inventive Principle:
Principle #10Preliminary action

2Adaptability or versatility

If static scheduling is used, then operational simplicity is maintained, but adaptability to changing demands deteriorates

Engineering Contradiction:
Improvescheduling adaptabilityVSAvoidresponse time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The system implements continuous feedback loops where sensor data from facilities is constantly collected, analyzed against historical data, and used to update forecasts. These forecasts feed back into the labor model generation, creating a closed-loop system that automatically adapts to changing conditions without manual intervention delays.

Inventive Principle:
Principle #23Feedback

Solution Approach 2:

The scheduling system transitions from static to dynamic operation by continuously updating forecasts based on real-time sensor data and historical patterns. The labor model is regenerated periodically or when significant changes are detected, allowing the system to adapt its scheduling recommendations to match current and predicted demand conditions.

Inventive Principle:
Principle #15Dynamics

3Productivity

If manual scheduling adjustments are made, then flexibility is maintained, but productivity and efficiency deteriorate

Engineering Contradiction:
Improvescheduling efficiencyVSAvoiddata utilization
Core Design Contradiction:
ProductivityVSLoss of information

Solution Approach 1:

The system performs self-service by automatically collecting sensor data, analyzing historical patterns, generating forecasts, and producing labor model recommendations without requiring manual scheduling intervention. The forecast module and labor model generator work autonomously to provide scheduling recommendations, freeing managers from time-consuming manual adjustments while improving efficiency through data-driven insights.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The system replaces manual mechanical scheduling processes with automated computational analysis. Instead of managers manually reviewing data and making adjustments, the forecast module uses algorithms to analyze sensor data and historical patterns, substituting human cognitive processing with automated computational systems that can process larger datasets more efficiently.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Data Source

PatentUS11537961B2Forecasting system
Publication Date: 2022.12.27 WALMART APOLLO LLC
  • US11537961B2 patent drawing
  • US11537961B2 patent drawing
  • US11537961B2 patent drawing

AI summary

Described in detail herein is a forecasting system. In one embodiment, the system can generate forecast data for amount of labor and physical objects needed at various facilities.