Attachment Sheath for Formwork Wall Guardrail Integration

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing guardrail installation methods require prior installation of sheaths on structures, necessitating manual intervention and extending construction time, especially when vertical walls are involved without a horizontal concrete structure.

Innovation Solution

Integration of a grip sleeve with a rectilinear structure and cooperation interface into the formwork wall structure, allowing for direct attachment of guardrails to vertical walls, using a binder layer and strategically positioned support points for stability and ease of assembly.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If sheaths are manually installed on structures before guardrail assembly, then guardrails can be securely positioned, but construction time increases and manual intervention is required

Engineering Contradiction:
Improveguardrail positioning securityVSAvoidconstruction time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The sheathes are pre-installed into the formwork during the concrete pouring process, so that by the time the formwork is removed, the sheathes are already in position and ready to receive guardrail posts. This preliminary action eliminates the need for separate manual installation of sheathes after formwork removal, thereby reducing construction time while maintaining secure guardrail positioning.

Inventive Principle:
Principle #10Preliminary action

2Ease of manufacture

If sheaths are integrated into horizontal concrete slabs, then manual installation is eliminated, but this solution cannot be applied to vertical walls without horizontal concrete structures

Engineering Contradiction:
Improveautomatic sheath integrationVSAvoidapplicability to vertical walls
Core Design Contradiction:
Ease of manufactureVSAdaptability or versatility

Solution Approach 1:

The invention adapts the sheath integration concept to work with both horizontal concrete slabs and vertical formwork walls. By designing the sheathes to be embedded directly into the formwork structure itself, the solution becomes universally applicable to different construction scenarios (horizontal and vertical), eliminating the limitation of only working with horizontal concrete structures.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Manufacturing precision

If dedicated workforce is allocated for sheath installation, then proper positioning is ensured, but labor requirements and intervention time increase

Engineering Contradiction:
Improvesheath positioning accuracyVSAvoidconstruction efficiency
Core Design Contradiction:
Manufacturing precisionVSProductivity

Solution Approach 1:

The formwork structure itself serves the dual function of both supporting the concrete pour and providing the mounting substrate for the sheathes. Workers installing the formwork automatically perform the sheath installation as part of the formwork assembly process, eliminating the need for a separate dedicated workforce for sheath installation while maintaining proper positioning accuracy.

Inventive Principle:
Principle #25Self-service

Data Source

PatentEP3851613A1Attachment sheath for accessory built into a formwork wall
Publication Date: 2021.07.21 SPURGIN LEONHART SAS
  • EP3851613A1 patent drawingFigure 1~3
  • EP3851613A1 patent drawingFigure 4~6
  • EP3851613A1 patent drawingFigure 7~8

AI summary

The object of the present invention relates to an accessory attachment sleeve (1) characterized in that the sleeve (1) comprises: - a straight structure (2) comprising at least an outer surface and an inner surface, the inner surface defining a housing (3), - at least one cooperation interface (4) comprising at least a first portion (4a) fixed to the outer surface of the straight structure (2) and a second portion (4b) formed by at least three non-aligned support points (4c), the cooperation interface (4) being configured to position the axis of the straight structure (2) in a plane parallel to the plane defined by the at least three non-aligned support points (4c) of the cooperation interface (4),the center of gravity of the attachment sleeve (1) being positioned such that the axis passing through this center of gravity and perpendicular to the plane defined by the at least three non-aligned support points (4c) crosses this plane at the level of an area delimited by these at least three non-aligned support points (4c).