Distribution Center Gate Assignment and Resource Scheduling

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Distribution centers face inefficiencies in product unloading due to unpredictable arrival times and varying preservation requirements, leading to potential spoilage and mismanagement of high-priority products.

Innovation Solution

A system that automatically assigns loading facilities and schedules tasks using product tracking services, transceivers, databases, and control circuits to determine estimated times of arrival, priority parameters, and resource availability, optimizing unloading and quality control processes based on anticipated product conditions.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If manual gate assignment and scheduling is used, then operational flexibility is maintained, but unloading efficiency and product preservation are compromised due to unpredictable arrivals

Engineering Contradiction:
Improveunloading efficiencyVSAvoidproduct waiting time on dock
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system performs preliminary actions by predicting truck arrival times and product requirements before actual arrival. The gate assignment system pre-calculates optimal gate allocations and prepares resource schedules in advance, so when trucks arrive, gates and resources are already ready, eliminating waiting time and improving unloading efficiency.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system implements continuous feedback loops where actual arrival times and unloading progress are monitored and fed back to the scheduling system. This real-time feedback allows dynamic adjustment of gate assignments and resource allocation, optimizing productivity while minimizing product waiting time on the dock.

Inventive Principle:
Principle #23Feedback

2Reliability

If gates are assigned without considering product priority, then gate utilization is simplified, but high-priority products may spoil or lose profit margin

Engineering Contradiction:
Improveproduct preservation reliabilityVSAvoidgate assignment system complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The system applies local quality by treating different products and gates differently based on their specific requirements. High-priority products receiving special preservation attention are assigned to gates with appropriate resources (e.g., refrigerated gates for perishable goods), while standard products use regular gates. This differentiated approach ensures product preservation reliability without requiring complete system reconfiguration.

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

The system changes parameters by incorporating product priority levels, preservation requirements, and predicted arrival times into the gate assignment algorithm. These parameter changes transform the gate assignment from a simple first-come-first-served approach to an optimized system that prioritizes products based on their specific needs, improving preservation reliability while maintaining manageable system complexity through automated calculations.

Inventive Principle:
Principle #35Parameter changes

3Measurement precision

If multiple resources are scheduled for each gate, then resource allocation accuracy improves, but scheduling complexity and computational requirements increase

Engineering Contradiction:
Improveresource allocation accuracyVSAvoidscheduling system complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The system segments the scheduling problem by dividing resources into distinct categories (gates, workers, equipment, vehicles) and handling assignments for each category separately but coordinately. This segmentation allows the system to manage complex multi-resource scheduling by breaking it down into manageable sub-problems, improving allocation accuracy while controlling computational complexity through modular processing.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentUS10628786B2System and method for gate and resource assignment at a distribution center
Publication Date: 2020.04.21 WALMART APOLLO LLC
  • US10628786B2 patent drawing
  • US10628786B2 patent drawing
  • US10628786B2 patent drawing

AI summary

An unloading gate at the destination is assigned and a first resources schedule for unloading personnel or automated vehicles to remove the products from the vehicle at the gate is determined by a control circuit based at least in part upon the anticipated future conditions of the product and resources information. A second resources schedule for quality control personnel or automated vehicles to inspect the products and to determine a quality control result based at least in part upon the anticipated future conditions of the product and the resources information. Based upon quality control results and the priority parameters, a product disposition schedule is determined by the control circuit.