Wind Turbine Generator Lifting Frame for Offshore Replacement

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The removal and replacement of offshore wind turbine generators are complex and costly due to the marine environment, requiring large crane jack-up vessels and significant deck space, limiting the ability to replace multiple generators simultaneously.

Innovation Solution

A wind turbine generator lifting device with a frame and couplings that attach to the generator's hub and nacelle faces, allowing hoisting and manipulation without detaching the nacelle, and a detachable support member for upright storage, reducing deck space requirements and lifting complexity.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If the entire nacelle and generator assembly is lifted as one piece, then the generator can be removed from the up-tower location, but the lifting weight and complexity increase significantly

Engineering Contradiction:
Improvegenerator removal operationVSAvoidlifting weight
Core Design Contradiction:
Ease of operationVSWeight of moving object

Solution Approach 1:

The invention segments the removal operation into two distinct phases: first removing the generator from the nacelle while it remains attached to the tower, then removing the nacelle separately. This is achieved through a lifting device that can attach to the generator's hub flange and lift it independently, avoiding the need to lift the entire nacelle-generator assembly and significantly reducing lifting weight and complexity

Inventive Principle:
Principle #1Segmentation

2Ease of operation

If the entire nacelle and generator assembly is lifted as one piece, then the generator can be removed, but the deck space requirements increase significantly

Engineering Contradiction:
Improvegenerator removal operationVSAvoiddeck space
Core Design Contradiction:
Ease of operationVSArea of stationary object

Solution Approach 1:

By segmenting the removal operation to extract the generator first while the nacelle remains attached to the tower, the invention eliminates the need for large deck space to accommodate both the nacelle and generator simultaneously. The generator can be lowered to a vessel or adjacent area while the nacelle remains in place, dramatically reducing the required deck footprint

Inventive Principle:
Principle #1Segmentation

3Ease of operation

If a large crane jack-up vessel is used, then the generator can be removed from the up-tower location, but the operational costs increase significantly

Engineering Contradiction:
Improvegenerator removal operationVSAvoidoperational cost
Core Design Contradiction:
Ease of operationVSLoss of energy

Solution Approach 1:

The segmented removal approach using a smaller crane vessel that can handle only the generator (not the entire nacelle) dramatically reduces charter costs and operational expenses compared to requiring a large jack-up vessel capable of lifting the combined nacelle-generator assembly

Inventive Principle:
Principle #1Segmentation

4Ease of operation

If significant deck space is available, then the generator can be accommodated once detached, but the vessel complexity and cost increase

Engineering Contradiction:
Improvegenerator accommodationVSAvoidvessel complexity
Core Design Contradiction:
Ease of operationVSDevice complexity

Solution Approach 1:

By segmenting the operation to remove only the generator rather than the entire nacelle, the invention enables the use of simpler, smaller vessels with less complex deck arrangements, eliminating the need for elaborate nacelle accommodation facilities while still providing adequate space for generator handling

Inventive Principle:
Principle #1Segmentation

Data Source

PatentEP4620885B1Wind turbine generator lifting device and methods of using the same
Publication Date: 2026.04.29 ORSTED WIND POWER AS
  • EP4620885B1 patent drawingFigure 1~2
  • EP4620885B1 patent drawingFigure 3~4
  • EP4620885B1 patent drawingFigure 5~6

AI summary

Wind turbine generator lifting device (1) for conveying a wind turbine generator (2), wherein the wind turbine generator (2) has a hub face (4) to which a blade hub is attachable to the generator (2) and a nacelle face (3) to which the generator (2) is attachable to a nacelle (17), the device (1) comprising: a frame (5) having a crane coupling (6) for hoisting by a crane; a first coupling (8) connectable to the hub face (4) for mounting the generator (2) onto the frame (5) in a first mounted configuration; and a second coupling (9) connectable to the nacelle face (3) for mounting the generator (2) onto the frame (5) in a second mounted configuration.