GIS-BIM Integration for Rail Construction Data Sharing

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Urban rail transportation construction and maintenance face challenges due to large construction scales, complex data management, and poor data sharing across disciplines, leading to inefficiencies and safety concerns, as traditional methods like BIM are limited to aboveground structures and fail to integrate full-cycle data.

Innovation Solution

A platform and method integrating Geographic Information System (GIS) and Building Information Modeling (BIM) for intelligent management of rail transportation work, enabling data sharing and fusion between 3D geological management platforms and BIM models, supporting construction and maintenance phases with progress control, safety, and risk management.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If traditional BIM model technology is used for construction information management, then three-dimensional display of design scheme is achieved, but it cannot realize control of construction progress and quality, and cannot integrate full cycle data of construction, operation and maintenance

Engineering Contradiction:
Improvethree-dimensional display of design schemeVSAvoidcontrol of construction progress and quality
Core Design Contradiction:
Ease of operationVSProductivity

Solution Approach 1:

The patent merges GIS (Geographic Information System) and BIM (Building Information Modeling) technologies to create an integrated platform. The GIS-BIM integration module combines spatial location data from GIS with detailed building information from BIM models, enabling both three-dimensional display and comprehensive control of construction progress, quality, and full-cycle data integration across construction, operation, and maintenance phases

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The platform is designed with multi-functionality to serve multiple purposes: it provides three-dimensional visualization, controls construction progress and quality, manages equipment and materials during operation, and maintains historical data for traceability. The system integrates information from diverse sources including geological data, construction documents, equipment records, and maintenance logs into a unified management platform

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Loss of information

If completion acceptance data transfer mode is used, then data transfer between construction and operation stages is achieved, but process and historical data transfer in construction stage is difficult to realize, affecting risk control traceability

Engineering Contradiction:
Improvedata transfer between stagesVSAvoidtraceability of historical problems
Core Design Contradiction:
Loss of informationVSReliability

Solution Approach 1:

The platform establishes continuous data transfer and storage mechanisms throughout the entire lifecycle. Construction data is continuously collected, stored, and linked to equipment information, creating an unbroken data chain from construction through operation to maintenance. This continuous action ensures that process data and historical information remain accessible and traceable, enabling reliable risk control and problem investigation

Inventive Principle:
Principle #20Continuity of useful action

Solution Approach 2:

The system implements feedback mechanisms that allow operation and maintenance data to feed back into construction phase analysis. Historical problem traceability is enabled through feedback loops that compare as-built conditions with design intentions, allowing identification of deviations and root causes. This feedback mechanism ensures data integrity and traceability across all project phases

Inventive Principle:
Principle #23Feedback

3Device complexity

If separate management of construction and operation data is implemented, then construction phase control is simplified, but data sharing and integration between disciplines is poor, affecting work efficiency and safety

Engineering Contradiction:
Improveconstruction phase controlVSAvoiddata sharing and integration efficiency
Core Design Contradiction:
Device complexityVSProductivity

Solution Approach 1:

The platform segments data management into distinct but interconnected modules: construction information management, operation and maintenance management, and data sharing integration. Each module handles specific data types and processes independently, simplifying control while maintaining integration capabilities through standardized interfaces and data exchange protocols

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The GIS-BIM integration platform serves as an intermediary that mediates between different disciplinary data systems. It provides standardized data formats, common reference frames, and unified access mechanisms that enable efficient data sharing between construction, operation, and maintenance departments, improving integration without overwhelming individual modules

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS12012136B2Platform and method for intelligent management of integration of construction and maintenance of rail transportation work
Publication Date: 2024.06.18 JINAN RAILWAY TRANSPORT GRP CO LTD
  • US12012136B2 patent drawing

AI summary

The present invention discloses a platform and method for intelligent management of integration of construction and maintenance of rail transportation work, comprising: a work construction information sharing module based on GIS and BIM is configured to realize the integration and data sharing between BIM model of each station and section of the rail transportation and a 3D geological management platform of rail transportation; a work construction informatization management module based on progress control is configured to provide an information control of work preparation plan, contract performance and measurement and pricing, safety and quality investigation, risk early warning and design change in the work construction stage; a rail transportation operation and maintenance module based on the integration of construction and maintenance is configured to provide an information management and control of equipment, materials and safety risk early warning in the rail transportation operation and maintenance stage. The present invention overcomes the shortcomings of single function of traditional technical methods and poor data effectiveness, and improving the sharing of engineering construction data resources, intelligent progress control and traceability of historical problems.