Problem

Aircraft glazing units suffer from erosion due to particulate matter and water droplets during flight, leading to clouding and degradation, necessitating frequent replacement, which is costly and time-consuming, and existing methods for extending service life through polishing risk weakening the glazing unit.

Innovation Solution

Incorporating subsurface thickness indicators, formed by laser etching at varying depths, to provide a visual indicator of remaining material thickness, allowing selective polishing and extended service life while maintaining uniformity and optical clarity.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If the glazing unit is polished to remove erosion and restore optical clarity, then the transparency and service life are extended, but the material thickness is reduced and the structural strength is weakened

Engineering Contradiction:
Improveoptical clarityVSAvoidstructural strength
Core Design Contradiction:
ReliabilityVSStrength

Solution Approach 1:

Thickness indicators are embedded in the glazing unit before service begins, allowing operators to monitor remaining material thickness in advance and plan polishing operations to maintain structural integrity while restoring optical clarity

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The visual thickness indicators provide continuous feedback on material remaining, enabling operators to control the polishing process precisely and stop before compromising structural strength, thus extending service life safely

Inventive Principle:
Principle #23Feedback

2Reliability

If the glazing unit is replaced frequently to maintain transparency standards, then the safety and regulatory compliance are ensured, but the operational time and cost increase

Engineering Contradiction:
Improvetransparency standardVSAvoidoperational time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

Thickness indicators are pre-installed to predict remaining service life before erosion becomes severe, allowing operators to schedule maintenance during planned downtime rather than performing emergency replacements that disrupt operations

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The glazing unit self-monitors its own condition through visible thickness indicators, eliminating the need for complex external measurement equipment and enabling operators to assess transparency status quickly without specialized tools

Inventive Principle:
Principle #25Self-service

3Device complexity

If visual inspection methods are used to assess erosion, then the equipment complexity is reduced, but the measurement accuracy deteriorates

Engineering Contradiction:
Improveinspection equipmentVSAvoiderosion measurement accuracy
Core Design Contradiction:
Device complexityVSMeasurement precision

Solution Approach 1:

Visual thickness indicators act as an intermediary between the complex internal erosion state and simple external observation, translating difficult-to-measure subsurface thickness into easily visible markers that maintain measurement precision while using only simple inspection tools

Inventive Principle:
Principle #24Intermediary (Mediator)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

Enables the glazing unit to be repolished selectively, extending its service life by providing a visual indicator of remaining thickness, ensuring even material distribution and preventing premature failure.

Implementation Method 1

the, or each, indicator is formed by subsurface laser etching

Methodology Applied
Scientific EffectLaser ablation: Laser Ablation

Data Source

PatentEP3670355B1Aircraft glazing unit
Publication Date: 2021.10.27 AIRBUS OPERATIONS LTD
  • EP3670355B1 patent drawingFigure 1
  • EP3670355B1 patent drawingFigure 2
  • EP3670355B1 patent drawingFigure 3

AI summary

Aircraft glazing units, such as those used to protect an aircraft's lighting systems, are exposed to particulate matter and water droplets during flight. These erode the outer surface of the glazing panel and thus detrimentally affect its transparency. The invention provides an aircraft glazing unit comprising a body of transparent material and at least one subsurface thickness indicator at a predetermined depth within the material. The provision of a subsurface thickness indicator allows for the unit to be re-polished to remove erosion, whilst providing a visual indicator to ground crew of the remaining thickness of material in the unit. In this way, the service lifetime of the glazing unit can be extended.