Grade Crossing Controller Speed-Adaptive Warning Timing

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional grade crossing control systems using constant warning time circuits activate warning devices for an unnecessarily long period when trains travel at speeds below the maximum expected speed, as the warning time is based on the length of the track approach chosen for maximum speed, leading to inefficient use of crossing time.

Innovation Solution

Implementing timed approach logic in grade crossing control systems that uses start and end inputs to calculate a configurable delay period based on the train's speed, allowing the crossing warning system to be activated only when necessary, thereby reducing unnecessary activation times.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If the track approach length is chosen based on maximum expected train speed, then safety is ensured for fast trains, but warning devices are activated for unnecessarily long periods when trains travel at slower speeds

Engineering Contradiction:
ImprovesafetyVSAvoidwarning device activation time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The system dynamically adjusts the warning device activation time based on the detected train speed. The controller measures the time for a train to traverse a known distance and calculates speed, then uses this speed information to determine the appropriate warning time, making the system adaptive rather than static

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system changes the time parameter of warning device activation based on the measured train speed. By calculating speed from traversal time and distance, the system adjusts the warning duration parameter to match actual train conditions rather than using a fixed maximum-based timing

Inventive Principle:
Principle #35Parameter changes

2Speed

If the track approach length is increased to accommodate maximum speed trains, then fast trains can be safely detected, but the system complexity increases

Engineering Contradiction:
Improvemaximum train speed handlingVSAvoidtrack approach configuration
Core Design Contradiction:
SpeedVSDevice complexity

Solution Approach 1:

The system replaces the mechanical/static approach length configuration with an electronic/dynamic speed measurement and calculation system. Instead of physically configuring track segments based on maximum speed, the system uses sensors and controllers to measure actual train speed and compute appropriate warning times

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Data Source

PatentUS11827260B2Grade crossing control system
Publication Date: 2023.11.28 SIEMENS MOBILITY INC
  • US11827260B2 patent drawing
  • US11827260B2 patent drawing
  • US11827260B2 patent drawing

AI summary

A grade crossing control system includes a controller that receives start and end inputs corresponding to a train traversing an outer approach, determines the difference in time between the start and end inputs, and uses the difference in time to determine a delay period by which activation of a grade crossing warning system will be delayed following detection of the train by a track occupancy circuit in an inner approach in order to compensate for slow moving trains. The start and end inputs for the outer approach may be supplied in different ways including a separate track occupancy circuit for the outer approach, by train detection devices unconnected to the track at the start and end of the outer approach, or by overlapping track occupancy circuits positioned at the start of the outer and inner approaches.