Apparatus for checking the operability of a heating system

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional heating systems lack secure operational readiness control, allowing unauthorized access and potential misuse, as the power supply switch is accessible to anyone, leading to economic and maintenance challenges.

Innovation Solution

A device that controls the connection between the control part and the controlled part of the heating system using switching elements, requiring predetermined information to establish operational readiness, with features like a real-time clock, external storage for secure information, and manipulation detection to ensure authorized access and limited operational modes.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If the power supply switch is made accessible for easy operation, then the ease of operation is improved, but the security against unauthorized access deteriorates

Engineering Contradiction:
Improveaccessibility of power supply switchVSAvoidsecurity against unauthorized access
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The patent introduces an intermediary device (operational readiness checker) that mediates between the user and the heating system's control unit. This device checks predetermined information before allowing the system to become operational, thus securing access while maintaining ease of operation through a simple check-in process.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If the connection between control unit and controlled part is interrupted for security, then the security is improved, but the operational readiness deteriorates

Engineering Contradiction:
Improvesecurity controlVSAvoidoperational readiness
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The patent implements a dynamic connection system where the electrical connection between the control unit and controlled part can be switched between connected and disconnected states. The connection is established only after successful verification of predetermined information, thus providing security while maintaining operational readiness when authorized.

Inventive Principle:
Principle #15Dynamics

3Adaptability or versatility

If multiple levels of operational readiness are defined, then the adaptability is improved, but the device complexity increases

Engineering Contradiction:
Improveoperational readiness levelsVSAvoidinformation structure
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent segments the operational readiness into multiple levels (e.g., partial operational readiness with certain circuits or modes disabled). Each level has its own predetermined information requirements, allowing flexible adaptation to different operational scenarios while managing complexity through structured information organization.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentEP3426987B1Apparatus for checking the operability of a heating system
Publication Date: 2022.09.21 KAMAX GMBH
  • EP3426987B1 patent drawingFigure 1
  • EP3426987B1 patent drawingFigure 2
  • EP3426987B1 patent drawingFigure 3

AI summary

According to the invention, an apparatus (1) for checking the operability of a heating system is connected between the control part (2) of the heating system and the heating system part (3) controlled by the control part, and in order to activate the connection, a predefined piece of information has to be input.