Hook Bar Reinforcement for Precast Concrete Panel Connectors

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Precast concrete panel connectors face reduced load capacity when positioned at the edge of the panel, leading to potential failure due to uneven distribution of load forces.

Innovation Solution

Incorporating hook bars within the precast concrete panel, which extend through an anchor volume and are positioned outside of it, to distribute load forces to a larger volume of the panel, thereby increasing the connector's load capacity.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If the connector is positioned at the edge of the precast concrete panel, then space utilization and structural efficiency are improved, but the load capacity of the connector is reduced

Engineering Contradiction:
Improvespace utilizationVSAvoidload capacity
Core Design Contradiction:
Adaptability or versatilityVSStrength

Solution Approach 1:

The patent applies local quality by adding hook bars specifically at the edge region where the connector is positioned, rather than uniformly reinforcing the entire panel. The hook bars are strategically placed to concentrate reinforcement where the load forces are most concentrated, creating a localized strengthening zone that increases load capacity without affecting the overall panel design

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

The patent introduces hook bars that extend in multiple dimensions - vertically through the anchor volume and horizontally outside it. This multi-dimensional arrangement allows the reinforcement to distribute load forces in both vertical and horizontal directions, effectively increasing the volume of concrete that participates in load resistance and thereby increasing the connector's load capacity

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Productivity

If the connector is positioned at the edge of the precast concrete panel, then structural efficiency is improved, but the panel is more likely to fail

Engineering Contradiction:
Improvestructural efficiencyVSAvoidpanel failure risk
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The hook bars are pre-installed in the concrete panel before the connector is positioned and loaded. This preliminary reinforcement is embedded in the concrete during panel fabrication, ensuring that the reinforcement is already in place and properly integrated into the panel structure before any loading occurs, thereby preventing failure rather than reacting to it

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The hook bars serve as a cushioning reinforcement that absorbs and distributes concentrated load forces before they can concentrate stress in the concrete to a level that would cause failure. By providing this reinforcement in advance, the panel is protected against potential failure points that would otherwise exist at the connector location

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

Data Source

PatentUS12110678B2Reinforcement for a connector in a precast concrete panel
Publication Date: 2024.10.08 MEADOW BURKE LLC
  • US12110678B2 patent drawing
  • US12110678B2 patent drawing
  • US12110678B2 patent drawing

AI summary

A reinforcement system is provided to strengthen a precast concrete panel with a connector that joins the panel with another structure such as a floor joist or concrete slab. One or more hook bars can be embedded in the panel proximate to the receiving member to distribute forces from the connector to a much larger volume of the panel. To accomplish this distribution, at least one hook bar can be positioned in an anchor volume defined by anchor members of the receiving member, and at least one hook bar can be positioned outside of the anchor volume. The hook bars can be oriented with a main body portion positioned proximate to the receiving member of the connector to resist tension forces caused by a load on the connector, and end portions of the at least one hook bar encompass the larger volume of the panel.