Modular Housing Unit Conduit Integration

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Traditional building methods for modular housing units are inefficient due to wasteful installation of conduits, difficulty in accessing embedded utilities, and complex on-site rework, leading to errors, downtime, and increased costs.

Innovation Solution

The Smart Adaptive Module (SAM) method involves manufacturing and integrating active components and conduits for utilities into modular units at a factory, using computer-aided design to optimize conduit placement and installation, allowing for a 'plug-and-play' assembly at the site with reduced on-site work and increased efficiency.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If conduits are installed during traditional building methods, then utilities can be provided to active components, but installation complexity and errors increase due to embedded utilities and on-site rework

Engineering Contradiction:
Improveinstallation accuracyVSAvoidconduit installation complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The patent applies preliminary action by pre-installing conduits within the modular housing units during factory manufacturing before on-site installation. This allows conduit placement to be performed under controlled conditions with precise positioning, eliminating the complexity of embedding utilities during traditional on-site construction and reducing installation errors.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent segments the housing unit into modular components with conduits pre-installed within each module. This segmentation allows conduits to be installed independently in controlled manufacturing environments rather than as part of a complex on-site integration process, reducing overall installation complexity and improving reliability.

Inventive Principle:
Principle #1Segmentation

2Productivity

If modular housing units are manufactured and installed traditionally, then construction can be completed, but on-site rework and downtime increase leading to higher costs

Engineering Contradiction:
Improveinstallation speedVSAvoidon-site rework time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent applies preliminary action by completing conduit installation and utility integration during factory manufacturing of modular units. This eliminates the need for time-consuming on-site rework and allows for rapid on-site assembly, significantly reducing construction downtime and increasing productivity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent uses standardized modular units that can be replicated and assembled on-site. This copying approach allows for quick replacement and installation without requiring custom on-site construction, reducing rework time and accelerating the overall construction process.

Inventive Principle:
Principle #26Copying

3Ease of repair

If conduits are embedded in housing structure, then utilities can be delivered, but accessibility for maintenance becomes difficult

Engineering Contradiction:
Improveconduit accessibilityVSAvoidutility delivery
Core Design Contradiction:
Ease of repairVSReliability

Solution Approach 1:

The patent segments conduits into modular sections that are pre-installed within individual housing modules. This segmentation maintains reliable utility delivery within each module while providing accessible maintenance points at module boundaries, eliminating the need to access embedded conduits within the housing structure itself.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentEP3507428B1A manufacturing and installation method for a housing unit
Publication Date: 2020.11.11 BAO HOUSE NV
  • EP3507428B1 patent drawingFigure 1
  • EP3507428B1 patent drawingFigure 2a~2b
  • EP3507428B1 patent drawingFigure 3~4

AI summary

There is disclosed a housing unit (1) comprising a first super-entity (10), the SAM super-entity (10), which comprises active entities and/or active components. The SAM super-entity (10) comprises a lower plinth system (14), an upper plinth system (16), and a plurality of cupboard modules (12) arranged between the lower plinth system (14) and the upper plinth system (16) which form the structure of the SAM super-entity (10).