Pre-Assembled HVAC Zone-Control Unit for Leak-Safe Installation

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current HVAC systems face challenges in assembly efficiency, cost, and maintenance due to the complexity of terminal units, which are prone to damage and require extensive on-site assembly, leading to increased labor costs and potential for biological contamination.

Innovation Solution

A fully-functional zone-control unit with standardized components, including a mechanical terminal unit, inlet and outlet piping assemblies, and a structure for easy handling and installation, which can be pre-assembled and tested off-site to reduce on-site assembly time and improve quality control.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If terminal units are assembled on-site, then adaptability to different installation locations is improved, but assembly time and labor costs increase

Engineering Contradiction:
Improveadaptability to installation locationsVSAvoidassembly time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The patent applies preliminary action by pre-assembling terminal units in a controlled factory environment before shipment to the job site. This includes pre-connecting piping assemblies to the coil, pre-installing electrical components, and pre-testing for leaks and proper operation. The pre-assembled units are then shipped as complete modules that require minimal on-site assembly, thus reducing assembly time while maintaining adaptability through standardized connection interfaces.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent segments the terminal unit into modular components that can be pre-assembled separately and then integrated on-site. The terminal unit is divided into the coil assembly, piping assemblies, electrical components, and housing, each prepared independently in the factory. This segmentation allows for efficient factory production while enabling flexible on-site installation to accommodate different location requirements.

Inventive Principle:
Principle #1Segmentation

2Productivity

If terminal units are pre-assembled off-site, then assembly efficiency and quality control are improved, but shipping and handling damage risk increases

Engineering Contradiction:
Improveassembly efficiencyVSAvoidshipping damage risk
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The patent applies beforehand cushioning by designing the terminal unit with built-in protection features before shipping. The coil is surrounded by protective packaging material, piping assemblies are secured with bracing structures, and fragile electrical components are cushioned with foam or air pillows. The entire assembly is placed in a rigid outer shell that distributes shipping forces, preventing damage during transit while maintaining the benefits of pre-assembly.

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

Solution Approach 2:

The patent uses flexible protective films and shells to cushion and protect the pre-assembled terminal unit during shipping. Bubble wrap, foam sheets, and flexible conforming packaging materials are applied around sensitive components like the coil and electrical wiring. These flexible protective layers absorb shocks and vibrations during handling and transit, reducing damage risk while allowing the unit to maintain its pre-assembled configuration.

Inventive Principle:
Principle #30Flexible shells and thin films

3Adaptability or versatility

If complex piping assemblies are used, then functional completeness is improved, but ease of installation and maintenance deteriorates

Engineering Contradiction:
Improvefunctional completenessVSAvoidease of installation
Core Design Contradiction:
Adaptability or versatilityVSEase of operation

Solution Approach 1:

The patent applies universality by designing standardized piping assemblies with uniform connection interfaces that can be used across different terminal unit configurations. The piping assemblies incorporate universal fittings, flanges, and connection points that work with various coil types and sizes. This standardization maintains functional completeness for different HVAC applications while simplifying installation procedures and reducing the need for custom fabrication on-site.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The patent applies preliminary action by pre-configuring complex piping assemblies in the factory with all necessary connections, supports, and insulation already in place. The piping is pre-routed, pre-supported, and pre-insulated according to the specific terminal unit design requirements. This pre-preparation eliminates the need for complex on-site piping work, making installation straightforward while maintaining the functional completeness required for different HVAC applications.

Inventive Principle:
Principle #10Preliminary action

4Adaptability or versatility

If extensive on-site assembly is required, then adaptability to specific site conditions is improved, but labor costs and potential contamination increase

Engineering Contradiction:
Improveadaptability to site conditionsVSAvoidbiological contamination
Core Design Contradiction:
Adaptability or versatilityVSObject-generated harmful factors

Solution Approach 1:

The patent applies preliminary action by performing assembly and testing in a controlled factory environment where biological contamination can be minimized through clean room practices, proper sanitation protocols, and controlled atmospheric conditions. The terminal units are pre-assembled, pre-tested for leaks and proper operation, and pre-packaged in protective wrapping that prevents contamination during shipping and storage. This reduces the need for extensive on-site assembly activities that could introduce contaminants to the HVAC system.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent segments the terminal unit into sealed modular components that are assembled in a controlled factory environment and then shipped as complete units. The housing, coil, piping assemblies, and electrical components are prepared separately in clean conditions and then integrated on-site with minimal exposure to contaminants. This segmentation allows factory assembly under controlled conditions while enabling final integration at the installation site to accommodate specific site requirements.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentUS7596962B2Shipping and installation for heating, ventilation, and air conditioning (HVAC)
Publication Date: 2009.10.06 KARAMANOS JOHN C
  • US7596962B2 patent drawing
  • US7596962B2 patent drawing
  • US7596962B2 patent drawing

AI summary

A zone-control unit adapted for facile inclusion in a building's ductwork includes a mechanical terminal unit, inlet and outlet piping assemblies that are mechanically coupled together. The structure also includes at least one handle so the zone-control unit may be conveniently and safely handled both during shipping, and during installation into a HVAC system. Prior to installation into a HVAC system the fully-functional zone-control unit also includes a pair of caps respectively sealing the ends of the piping assemblies, and a pressure gauge for sensing pressurization of the piping assemblies and coil which the caps seal. Sealed in this way a pressure gauge permits testing to assure that the piping assemblies and coil are leak free, and readily assessing that zone-control units remain leak free until they are about to be installed into a building's HVAC system.