Problem

Migrating complex computer applications across hybrid cloud environments is challenging due to the difficulty in replicating original VLANs, subnets, and addresses, leading to functional disruptions and requiring extensive reconfiguration, which is time-consuming and often impossible without knowledge of the original network configurations.

Innovation Solution

The implementation of a system that uses a network virtualization manager to create secure overlay networks, a workload migrater to migrate workloads between physical, virtual, or cloud servers, and a migration manager to automate the process, ensuring that workloads retain their original network configuration and relationships, thereby maintaining application functionality without modifying the application or user access procedures.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If workload migration is performed in hybrid cloud environment, then resource flexibility and cost optimization are improved, but network configuration complexity and migration difficulty increase

Engineering Contradiction:
Improveresource flexibilityVSAvoidnetwork configuration complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The patent introduces a network virtualization layer with overlay networks as an intermediary between the physical infrastructure and workload network configurations. This virtualization layer abstracts the complex physical network topology, allowing workloads to maintain their original network configurations while being migrated across different physical locations in the hybrid cloud environment.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The patent adds a virtual network dimension above the physical network infrastructure. By creating overlay networks that operate in this additional virtual dimension, the system enables workloads to access each other through virtual network paths that are independent of the underlying physical network topology, thus simplifying migration while maintaining network relationships.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Productivity

If complex applications are migrated across hybrid cloud environments, then resource utilization efficiency is improved, but migration time and operational disruption increase

Engineering Contradiction:
Improveresource utilization efficiencyVSAvoidmigration time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The patent performs preliminary actions by pre-configuring overlay networks and establishing virtual network paths before actual workload migration occurs. The network virtualization infrastructure is prepared in advance, and network relationships are mapped and preserved, allowing workloads to be migrated without needing to reconfigure network connections during the migration process.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent creates virtual copies of network configurations and overlay network representations that can be replicated and transported with workloads. These virtual network configuration copies allow workloads to maintain their original network identities and relationships in the target environment without requiring time-consuming reconfiguration.

Inventive Principle:
Principle #26Copying

3Reliability

If original network configurations are preserved during migration, then application functionality is maintained, but migration complexity increases

Engineering Contradiction:
Improveapplication functionalityVSAvoidmigration complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The network virtualization layer acts as an intermediary that decouples the workload's network configuration from the physical network infrastructure. By introducing this virtualization intermediary, the system can preserve original network configurations at the workload level while the physical migration occurs transparently in the background without affecting application functionality.

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The patent segments the network configuration into two independent layers: the virtual overlay network layer that preserves workload identities and relationships, and the physical infrastructure layer that handles actual migration. This segmentation allows each layer to be managed independently, maintaining application functionality while simplifying the migration process.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentUS9461969B2Migration of complex applications within a hybrid cloud environment
Publication Date: 2016.10.04 RACEMI
  • US9461969B2 patent drawing
  • US9461969B2 patent drawing
  • US9461969B2 patent drawing

AI summary

A system and methods for the migration of complex computer applications and the workloads comprising them between physical, virtual, and cloud servers that span a hybrid cloud environment comprising private local and remote customer data centers and public cloud data centers, without modification to the applications, their operational environments, or user access procedures. A virtual network manager securely extends the subnets and VLANS within the customer's various data center across the distributed, hybrid environment using overlay networks implemented with virtual network appliances at nodes of the overlay network. A server migrater migrates individual workloads of servers used by the complex application from one pool of server resources to another. A migration manager application provides a control interface, and also maps and manages the resources of the complex application, the hybrid environment, and the virtual network spanning the hybrid cloud environment.