Hybrid Precast Concrete System for Rapid Assembly and Structural Continuity

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional building construction methods, such as cast-in-place concrete and precast concrete, face challenges in speed and strength, with cast-in-place being labor-intensive and time-consuming, and precast lacking structural continuity and load transfer between bays.

Innovation Solution

A hybrid system combining precast vertical components and cast-in-place horizontal components, where precast elements are used for rapid construction and cast-in-place elements are supported temporarily during curing, allowing for quicker assembly and improved structural strength by redistributing stresses across greater lengths.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If precast concrete panels are used for rapid assembly, then construction speed is improved, but structural continuity and load transfer between bays deteriorate

Engineering Contradiction:
Improveconstruction speedVSAvoidstructural continuity
Core Design Contradiction:
ProductivityVSStrength

Solution Approach 1:

The structure is divided into precast vertical columns and horizontal beams, with cast-in-place concrete infill panels. This segmentation allows rapid assembly of structural elements while the infill panels provide continuity. The vertical columns are precast for speed, while horizontal beams connect them, and cast-in-place infill panels fill the spaces between, creating a hybrid system that combines the advantages of both precast and cast-in-place construction.

Inventive Principle:
Principle #1Segmentation

2Strength

If cast-in-place concrete construction is used, then structural strength and continuity are improved, but construction time and labor intensity increase

Engineering Contradiction:
Improvestructural continuityVSAvoidconstruction time
Core Design Contradiction:
StrengthVSLoss of time

Solution Approach 1:

The construction process is segmented into phases where precast elements (columns, beams) are installed first to provide immediate structural framework and load-bearing capacity. Then cast-in-place concrete infill panels are added to provide continuity and complete the structural system. This segmentation allows the time-consuming cast-in-place work to be done in smaller, parallel sections rather than requiring entire structures to be poured and cured sequentially.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Precast concrete columns and beams are manufactured off-site in advance and delivered to the construction site ready for installation. This preliminary action removes the time-consuming formwork, pouring, and curing processes from the critical construction path, allowing the structural framework to be assembled rapidly while cast-in-place infill panels are added subsequently to provide continuity without delaying the overall construction schedule.

Inventive Principle:
Principle #10Preliminary action

3Productivity

If precast panels are transported to site, then construction speed is improved, but panel size is limited and structural span capability deteriorates

Engineering Contradiction:
Improveassembly speedVSAvoidpanel size
Core Design Contradiction:
ProductivityVSLength of moving object

Solution Approach 1:

The structural system is segmented into smaller, transportable precast columns and beams that can be delivered by standard equipment, and cast-in-place infill panels that are poured on-site. This segmentation bypasses the transportation size limitation by using smaller modular precast elements that assemble into larger structural configurations, with the infill panels providing the necessary span coverage between structural members.

Inventive Principle:
Principle #1Segmentation

Data Source

PatentUS10094101B1Precast concrete system with rapid assembly formwork
Publication Date: 2018.10.09 JAZZAR MOHAMMAD OMAR A
  • US10094101B1 patent drawing
  • US10094101B1 patent drawing
  • US10094101B1 patent drawing

AI summary

The disclosed system divides the precast and cast-in-place construction into vertical and horizonal components. The vertical components are precast, permitting rapid vertical building construction without a delay for concrete to set. The two primary precast components are a column that includes a horizontal inflexible slab portion, and a central panel placed diagonally between columns. Each precast component is a weight and size that is readily manageable using a standard construction crane.The horizontal components are a combination of cast-in-place, and precast components. The result creates a continuous unitary floor structure that carries larger loads with less thickness that purely simple span pre-cast construction.