Hydraulic connection module intended to be used in the field of construction
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Existing hydraulic connection systems in building construction, particularly in boiler rooms supplying multiple apartments with hot water and heating, face challenges of space optimization, leading to difficulties in installation and increased risks of leaks due to the need for extensive equipment and reduced workspaces.
Innovation Solution
A compact hydraulic connection module comprising a single, U-shaped tube assembly with integrated valves and meters, allowing for reduced dimensions and streamlined installation by pre-assembling components in a factory, which can be oriented and installed in various positions, minimizing the need for on-site equipment and reducing assembly time.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Area of stationary object
If traditional hydraulic connection systems are used with multiple separate components, then complete hydraulic functions (valves, meters, connections) are provided, but the space required for installation increases and installation complexity increases
Solution Approach 1:
The patent combines multiple hydraulic components (isolation valves, volumetric meters, energy meters, and connection points) into a single integrated prefabricated module. This merging of previously separate components into one unified structure directly reduces the installation space while maintaining all necessary hydraulic functions.
Solution Approach 2:
The hydraulic system is segmented into modular prefabricated units that can be manufactured separately and then installed as complete functional blocks. This segmentation allows each module to be optimized independently and simplifies on-site installation by reducing the number of individual assembly operations required.
2Productivity
If multiple separate hydraulic components are installed on-site, then complete hydraulic functionality is achieved, but installation time increases and risk of leaks increases
Solution Approach 1:
All hydraulic components including valves, meters, and connections are pre-assembled and pre-tested in a controlled factory environment before delivery to the construction site. This preliminary assembly and testing ensures connection tightness is verified before installation, eliminating the risk of leaks during on-site assembly while significantly reducing installation time.
3Area of stationary object
If confined space installation is used to optimize living area, then space is saved, but installation difficulty increases and faulty connections risk increases
Solution Approach 1:
By merging all hydraulic components into one compact prefabricated module, the overall installation footprint is minimized, allowing installation in confined spaces without compromising installer accessibility. The integrated design maintains adequate internal spacing for proper assembly while presenting a compact external form factor.
Data Source
Figure 1
Figure 2a~2c
Figure 3~4
AI summary
A hydraulic connection module intended for use in the construction of buildings equipped with a boiler room supplying several apartments with water, domestic hot water, and/or hot water for central heating. It consists of a single unit comprising a plate (1) to which are attached multiple tubes (20), each designed to form an interface between an individual circuit and a water column. Each tube (20) has an inlet for connection to a water column and an outlet for connection to an individual circuit. The tubes (20) are U-shaped, with the U-shaped sections arranged side-by-side in parallel or non-parallel planes. Their parallel arms (21, 22) pass perpendicularly through a plate (10) of the base (1) via two holes (12, 13), so that the inlet and outlet ports open on the other side of said plate (10).