Temporary Impermeable Sleeve for Well Component Installation
Solution Overview
Problem
Existing techniques for making permeable well components impermeable for installation in boreholes are not cost-effective and do not provide the necessary mechanical properties or high permeability with low pressure drop for operations.
Innovation Solution
A well component with a sleeve that is initially impermeable but becomes permeable in response to an agent such as hydrochloric acid or wellbore fluid, using plugging materials like aluminum or polyglycolic acid that can be removed to allow fluid flow, ensuring the component is impermeable during installation and permeable for use.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Reliability
If a permeable well component is used during installation, then fluid flow is allowed during run-in, but the component cannot maintain mechanical properties or prevent particulate ingress during installation
Solution Approach 1:
The well component is pre-coated with a plugging material (such as wax, polymer, or dissolvable material) before installation. This preliminary coating action creates an impermeable barrier during the run-in phase, preventing particulate ingress while maintaining the component's mechanical integrity. After installation, a reactive fluid is introduced to remove the coating, restoring permeability for production.
Solution Approach 2:
A reactive fluid (such as acid or solvent) is introduced as an intermediary substance to interact with the plugging material coating. The reactive fluid selectively removes or degrades the coating material after installation, transitioning the component from an impermeable state during installation to a permeable state for production, thereby resolving the contradiction between needing impermeability during run-in and permeability during operation.
2Reliability
If a plugging coating is applied to make the component impermeable during run-in, then mechanical protection is provided, but the component cannot provide high permeability and low pressure drop for operations
Solution Approach 1:
The permeability parameter of the well component is dynamically changed through the application and subsequent removal of a plugging coating. During installation, the coating parameter is set to impermeable to protect against particulate ingress. After installation, a reactive fluid changes the coating's properties by dissolving or degrading it, transitioning the component to a highly permeable state with low pressure drop for production operations.
Solution Approach 2:
The plugging coating is designed as a temporary, sacrificial layer that serves its protective function only during the installation phase. The coating material is selected to be removable by a reactive fluid, allowing the component to transition from a protected impermeable state to a functional permeable state. This disposable coating approach enables the component to provide high permeability and low pressure drop during operations without compromising installation integrity.
3Productivity
If reactive fluid is used to remove plugging material, then permeability is restored, but the process complexity and cost increase
Solution Approach 1:
The plugging coating material is selected to automatically respond to common downhole fluids (such as formation water or injected acids) by dissolving or degrading on contact. This self-service mechanism eliminates the need for complex external intervention systems, as the coating removal is triggered automatically by the presence of the reactive fluid during normal well operations, thereby reducing process complexity while restoring permeability.
Applied Scientific Principles
This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.
Function Achieved in This Case
This solution allows for the creation of a cost-effective well component that maintains mechanical properties and offers high permeability with low pressure drop, facilitating efficient operations by ensuring the well component is impermeable during installation and permeable for fluid communication.
Implementation Method 1
The sleeve is at least temporarily impermeable to obstruct the well component during run in the borehole and becomes permeable in response to an agent, such as hydrochloric acid, a hydrofluoric acid, an acid stimulation, a wellbore fluid, or a drilling fluid
Implementation Method 2
using plugging materials like aluminum or polyglycolic acid that can be removed to allow fluid flow
Data Source
AI summary
An apparatus for installation in a borehole comprises a well component and a sleeve. The well component has a through-bore and is permeable to the borehole. For example, the well component can be a well screen having a perforated basepipe with a filter disposed thereabout or can be a liner defining a plurality of openings therein. The sleeve is disposed external to the well component. The sleeve is at least temporarily impermeable to obstruct the well component during run in the borehole and becomes permeable in response to an agent, such as a hydrochloric acid, a hydrofluoric acid, an acid stimulation, a wellbore fluid, or a drilling fluid, for example.



