Automated Installer Certification System for Fire Extinguishing Facilities

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current certification procedures for installer companies of fire extinguishing facilities lack a uniform and objective evaluation standard, leading to inefficiencies and potential safety concerns due to varying criteria relevance and minor deficiencies being overlooked.

Innovation Solution

A method and system for automatic evaluation using an evaluation metric that objectively assesses criteria fulfillment, incorporating mandatory and non-mandatory criteria with weighted relevance, ensuring consistent and efficient certification through automated processing and document authentication.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If manual certification procedures are used to evaluate installer companies, then flexibility in assessment can be applied, but uniformity and objectivity of evaluation standards deteriorate

Engineering Contradiction:
Improveflexibility in assessmentVSAvoiduniformity of evaluation standards
Core Design Contradiction:
Adaptability or versatilityVSMeasurement precision

Solution Approach 1:

The patent replaces manual mechanical assessment procedures with an automated computer-based evaluation system. The system automatically collects data from multiple sources, applies predefined evaluation criteria with assigned weights, and generates objective certification results without human intervention in the calculation process, thereby ensuring uniformity while maintaining flexibility through configurable parameters.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The patent introduces a multi-parameter evaluation model where different criteria (quality management, safety standards, technical competence) are assigned specific weights and thresholds. This parameter-based approach allows the system to flexibly adjust assessment strictness for different criterion types while maintaining consistent application of the evaluation model across all installer companies.

Inventive Principle:
Principle #35Parameter changes

2Reliability

If comprehensive criteria checking is performed to ensure thorough evaluation, then certification reliability improves, but assessment time and complexity increase

Engineering Contradiction:
Improvecertification reliabilityVSAvoidassessment time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent performs preliminary data collection and validation automatically before the main evaluation process. The system pre-configures evaluation criteria, establishes weightings, and prepares assessment templates in advance, allowing the actual certification process to proceed efficiently without manual setup for each evaluation while maintaining comprehensive checking of all required criteria.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent uses standardized evaluation templates and criteria checklists that can be replicated across multiple assessments. By copying proven evaluation frameworks and automatically applying them to different installer companies, the system ensures thorough and reliable assessment without requiring proportional increases in assessment time for each case.

Inventive Principle:
Principle #26Copying

3Productivity

If automated evaluation systems are implemented to ensure uniformity, then assessment speed and consistency improve, but handling of complex judgment cases deteriorates

Engineering Contradiction:
Improveassessment speedVSAvoidhandling of complex judgment cases
Core Design Contradiction:
ProductivityVSAdaptability or versatility

Solution Approach 1:

The patent introduces a multi-layered evaluation architecture where automated systems handle routine data collection and initial assessment, while human experts serve as intermediaries for complex judgment cases. The system can escalate specific criterion evaluations to expert reviewers who provide detailed assessments, which are then integrated into the overall automated evaluation result, combining speed with nuanced judgment capability.

Inventive Principle:
Principle #24Intermediary (Mediator)

4Reliability

If strict criterion fulfillment requirements are enforced to ensure safety, then certification quality improves, but number of certified companies decreases

Engineering Contradiction:
Improvecertification qualityVSAvoidnumber of certified companies
Core Design Contradiction:
ReliabilityVSQuantity of substance

Solution Approach 1:

The patent applies differentiated evaluation strictness to different criterion categories. Mandatory criteria (safety standards, legal requirements) are enforced with absolute thresholds that must be fully met, while optional or desirable criteria allow partial fulfillment with weighted scoring. This local quality approach ensures high certification quality for critical aspects while permitting certification of companies with minor deficiencies in less critical areas, maintaining both safety standards and reasonable certification numbers.

Inventive Principle:
Principle #3Local quality

Data Source

PatentUS20220391920A1Method and system for the automatic assessment of installer companies for fire-extinguishing facilities
Publication Date: 2022.12.08 VDS SCHADENVERHUETUNG GMBH
  • US20220391920A1 patent drawing
  • US20220391920A1 patent drawing

AI summary

A method for the automatic evaluation of installer companies for fire extinguishing facilities is proposed, wherein several criteria for the certification of an installer company are specified, wherein an evaluation metric is specified on the system side, by means of which indications on the fulfillment of the criteria are automatically evaluated and it is determined whether the requirements for a certification of the installer company are fulfilled. Furthermore, a corresponding system for the automatic evaluation of installer companies of fire extinguishing facilities is proposed.