Problem

Component-based fire suppression systems require extensive time and resources for installation, maintenance, and repair due to separate component reviews and installations, which is particularly challenging in regulated environments like the nuclear industry, where each component must meet strict quality and safety standards.

Innovation Solution

An integrated fire suppression system is provided, where all components are assembled into a single panel, allowing for off-site inspection and assembly, reducing on-site time and qualifying processes, with a modular cabinet design that isolates and stabilizes components, enabling easy maintenance and containment of failures, and plug-and-play installation.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If component-based fire suppression systems are used, then each component can be independently manufactured and approved, but installation and maintenance time increases significantly due to separate component reviews and installations

Engineering Contradiction:
ImproveIndependent component manufacturingVSAvoidInstallation and maintenance time
Core Design Contradiction:
Ease of manufactureVSLoss of time

Solution Approach 1:

The patent combines multiple separate fire suppression components (control panel, power supply, fluid tanks, piping, nozzles) into a single integrated panel assembly. This merging allows the entire system to be pre-assembled, pre-tested, and pre-approved as one unit, eliminating the need for separate component reviews during installation and significantly reducing on-site installation and maintenance time.

Inventive Principle:
Principle #5Merging (Combining)

2Adaptability or versatility

If multiple separate components are installed, then system flexibility and adaptability are improved, but device complexity and installation complexity increase

Engineering Contradiction:
ImproveSystem flexibilityVSAvoidInstallation complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The integrated panel is designed as a universal module that incorporates multiple functions within a single assembly. The panel includes control electronics, power management, fluid storage, and discharge mechanisms all integrated into one standardized unit that can be installed in various locations and configurations, maintaining system flexibility while simplifying installation procedures.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Reliability

If component-based systems are used in nuclear industry, then each component can meet NQA-1 requirements individually, but man-hours and security requirements multiply significantly

Engineering Contradiction:
ImproveNQA-1 complianceVSAvoidInstallation efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The entire integrated panel is assembled, tested, and certified for NQA-1 compliance before being shipped to the nuclear facility. This preliminary action allows quality assurance activities to be performed in a controlled manufacturing environment rather than on-site, reducing the number of personnel hours and security requirements needed during actual installation and maintenance operations at the nuclear facility.

Inventive Principle:
Principle #10Preliminary action

4Adaptability or versatility

If separate components are installed from different companies, then component specialization is improved, but expense and installation delay increase

Engineering Contradiction:
ImproveComponent specializationVSAvoidInstallation delay
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The patent integrates components from different specialized manufacturers into a single unified panel assembly. By merging these specialized components into one pre-assembled unit, the system maintains the benefits of component specialization while eliminating the delays associated with coordinating installation from multiple independent companies, as the entire assembly can be installed as a single module.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS11883700B1Integrated panel for fire suppression system
Publication Date: 2024.01.30 ACME GROUP LLC
  • US11883700B1 patent drawing
  • US11883700B1 patent drawing
  • US11883700B1 patent drawing

AI summary

The present system provides an integrated fire suppression system that includes all components in a single integrated panel, other than system piping to nozzles or emitters. The system enables the entire panel to be inspected and analyzed, and installed, repaired, or maintained in a single operation, dramatically reducing time spent on site and reducing the qualifying process as well. The assembly of the panel is off-site, typically under the inspection of any qualifying agencies. Once assembled, the system can remain qualified for rapid installation at any future time, allowing easy replacement of faulty panels or consumables.