Integrated Scheduling and Budgeting System for Project Data Consistency
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Current calendaring and spreadsheet software used in production scheduling and budgeting are inflexible, time-consuming, and prone to errors, requiring manual updates and data duplication across multiple documents, leading to inefficiencies and inaccuracies in project management.
Innovation Solution
A scheduling and budgeting application that creates a shared database of industry-standard items and data across user interfaces, allowing synchronized updates and automatic data synchronization across all interfaces, enabling users to easily manage project schedules, budgets, and cash flows in a single platform.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Loss of information
If separate calendaring and spreadsheet software are used for scheduling and budgeting, then data can be stored in each application, but manual updates and data duplication are required across multiple documents, leading to time-consuming and error-prone processes
Solution Approach 1:
The patent combines separate calendaring and spreadsheet applications into a single integrated system where schedule data and budget data share common data structures and formulas. This allows automatic synchronization between calendar events and budget calculations, eliminating manual data duplication and ensuring consistency across all project management documents.
Solution Approach 2:
The integrated system provides universal data structures that serve multiple functions simultaneously - the same data elements are used for both scheduling and budgeting purposes. This multi-functionality allows a single data entry to update both calendar events and financial calculations, reducing the time required for manual updates across different document types.
2Adaptability or versatility
If common calendaring software is used for production scheduling, then basic calendar functions are available, but the software is highly inflexible and requires manual cutting and pasting for schedule changes, which is time-consuming and error-prone
Solution Approach 1:
The patent implements dynamic schedule management where calendar events and budget data are automatically recalculated when changes are made. The system dynamically adjusts dependent events and updates associated budget items without requiring manual intervention, making the software flexible enough to handle production schedule changes while maintaining ease of operation.
Solution Approach 2:
The integrated system provides immediate feedback when schedule changes are made - the system automatically updates budget calculations and notifies users of affected items. This feedback mechanism ensures that schedule flexibility is maintained while preventing errors through automatic consistency checks across all project data.
3Quantity of substance
If spreadsheet software is used for budgeting and cash flow, then financial calculations can be performed, but the software is inconvenient and error-prone when data ranges exceed viewable page dimensions, requiring toggling between print view and editing interface
Solution Approach 1:
The patent transitions from traditional two-dimensional spreadsheet views to a multi-dimensional data structure that can display and edit large datasets without requiring page toggling. The system uses virtual scrolling, hierarchical navigation, and integrated viewing modes that allow users to access and edit any portion of large budget ranges while remaining in a single continuous editing interface.
4Reliability
If manual updates are performed across multiple documents, then each document can be updated independently, but errors are easily introduced and conformity between documents is difficult to maintain
Solution Approach 1:
The integrated system performs self-service updates through automatic formula recalculation and data synchronization. When source data changes, the system automatically updates all dependent calendar events, budget items, and cash flow projections without requiring manual intervention, thereby maintaining high data accuracy while preserving update productivity.
Data Source
AI summary
Generating budgeting information for a project is disclosed. An indication of a project phase and a time period associated with the project phase are received. Financial data associated with the project phase is received. Budgeting information is automatically generated based at least in part on the time period and the financial data.


