Production Management for Interrupt Substrates in Component Mounting Lines

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The replacement of equipment in component mounting lines to produce interrupt type substrates significantly decreases production efficiency, as it requires stopping and reconfiguring the existing production lines.

Innovation Solution

A production management method that reads production data for interrupt type substrates and collects equipment data from multiple component mounting lines to determine the most suitable line for producing the interrupt type substrate with minimal changes to the existing equipment, optimizing the use of available resources and reducing the need for operator intervention.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Adaptability or versatility

If equipment replacement is performed to produce interrupt type substrates, then the ability to produce different substrate types is improved, but production efficiency significantly decreases

Engineering Contradiction:
Improveability to produce different substrate typesVSAvoidproduction efficiency
Core Design Contradiction:
Adaptability or versatilityVSProductivity

Solution Approach 1:

The patent enables existing component mounting lines to perform multiple functions by allowing them to produce both their primary substrate type and interrupt type substrates without equipment replacement. The system achieves this by dynamically allocating production capacity and using the same mounting heads and equipment for different substrate types, thereby eliminating the need for dedicated equipment while maintaining production efficiency.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The patent implements dynamic production management where the component mounting lines can flexibly switch between producing primary substrates and interrupt type substrates based on production needs. The controller dynamically adjusts production parameters, mounting head selections, and process conditions to accommodate different substrate types without physical equipment changes, enabling the system to adapt to varying production requirements in real-time.

Inventive Principle:
Principle #15Dynamics

2Adaptability or versatility

If equipment replacement is performed to produce interrupt type substrates, then production of interrupt type substrates is enabled, but operator workload increases

Engineering Contradiction:
Improveproduction capability for interrupt type substratesVSAvoidoperator workload
Core Design Contradiction:
Adaptability or versatilityVSEase of operation

Solution Approach 1:

The patent implements a self-service system where the controller automatically manages the entire process of producing interrupt type substrates. The system autonomously selects appropriate component mounting lines, configures mounting heads, adjusts production parameters, and coordinates the manufacturing process without requiring operator intervention for equipment replacement or reconfiguration. This automation eliminates the manual workload associated with equipment changes while maintaining the ability to produce diverse substrate types.

Inventive Principle:
Principle #25Self-service

3Adaptability or versatility

If equipment is reconfigured for interrupt type substrate production, then production flexibility is improved, but production time increases

Engineering Contradiction:
Improveproduction flexibilityVSAvoidproduction time
Core Design Contradiction:
Adaptability or versatilityVSLoss of time

Solution Approach 1:

The patent implements preliminary action by pre-configuring multiple component mounting lines with different mounting heads and capabilities to handle various substrate types. The system maintains ready-to-use configurations for both primary and interrupt type substrates in advance, so when interrupt type substrate production is needed, the controller can immediately allocate an appropriately pre-configured line without requiring time-consuming equipment reconfiguration or replacement during production.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS10466685B2Production management method of substrate in component mounting system
Publication Date: 2019.11.05 PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
  • US10466685B2 patent drawing
  • US10466685B2 patent drawing
  • US10466685B2 patent drawing

AI summary

In a production management method of a substrate in a component mounting system having plural component mounting lines configured to include plural component mounting apparatuses, reading production data of an interrupt type substrate; collecting equipment data of each of the component mounting lines; and determining at least one component mounting line to produce the interrupt type substrate based on the read production data of the interrupt type substrate and the collected equipment data of each of the component mounting lines are performed.