Inverter Islanding Detection via Frequency Disturbance

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current islanding detection methods in distributed generation systems are inefficient and costly, often failing to detect islanding conditions due to non-detection zones and interfering with power quality, particularly in scenarios where the load and generation are closely matched.

Innovation Solution

A controller generates a disturbance signal to monitor variations in the command frequency of the inverter, distinguishing between tank and islanding conditions by locking within a frequency band, allowing for robust and cost-effective detection and disconnection from the grid when an islanding condition is identified.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If passive detection methods (over/under frequency protection, over/under voltage protection) are used, then the detection system is simple to implement, but it fails to detect islanding in certain loading conditions leading to non-detection zones

Engineering Contradiction:
Improveimplementation simplicityVSAvoidislanding detection reliability
Core Design Contradiction:
Ease of manufactureVSReliability

Solution Approach 1:

The system performs preliminary action by intentionally creating a tank condition (resonant condition) before actual islanding detection. By pre-establishing a known resonant frequency condition through controlled reactive power compensation, the system ensures that frequency deviations will occur upon islanding, eliminating the non-detection zones that plague passive methods. This preliminary setup guarantees detectable frequency changes while maintaining implementation simplicity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The invention changes the operating parameters by dynamically adjusting reactive power compensation to create and maintain a tank condition. By modifying the reactive power parameter Q to match the resonant condition of the load, the system transforms the detection landscape so that islanding always produces measurable frequency deviations, thereby eliminating non-detection zones while keeping the system relatively simple to implement.

Inventive Principle:
Principle #35Parameter changes

2Reliability

If active detection methods are used to reduce non-detection zones, then detection reliability improves, but power quality is interfered with and maximum power point tracking is affected

Engineering Contradiction:
Improveislanding detection reliabilityVSAvoidpower quality interference
Core Design Contradiction:
ReliabilityVSObject-generated harmful factors

Solution Approach 1:

The system performs preliminary action by intentionally creating a tank condition (resonant condition) before actual islanding detection. By pre-establishing a known resonant frequency condition through controlled reactive power compensation, the system ensures that frequency deviations will occur upon islanding, eliminating the non-detection zones that plague passive methods. This preliminary setup guarantees detectable frequency changes while maintaining implementation simplicity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The invention changes the operating parameters by dynamically adjusting reactive power compensation to create and maintain a tank condition. By modifying the reactive power parameter Q to match the resonant condition of the load, the system transforms the detection landscape so that islanding always produces measurable frequency deviations, thereby eliminating non-detection zones while keeping the system relatively simple to implement.

Inventive Principle:
Principle #35Parameter changes

3Reliability

If remote detection techniques (power line communication, supervisory control and data acquisition) are used, then non-detection zones are eliminated, but the implementation cost becomes expensive

Engineering Contradiction:
Improveislanding detection reliabilityVSAvoidimplementation cost
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The system applies self-service by using the DG system's own reactive power compensation capability to create the tank condition and enable detection. Instead of requiring external communication infrastructure or supervisory systems, the DG system uses its built-in power electronics and control algorithms to autonomously establish the resonant condition and detect islanding, thereby achieving high reliability without expensive remote communication infrastructure.

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The invention makes the reactive power compensation device serve multiple functions: it provides its original power quality improvement function while simultaneously creating the tank condition for reliable islanding detection. This multi-functionality eliminates the need for separate expensive remote detection systems, as the same power electronics equipment performs both compensation and detection tasks, reducing overall system cost while maintaining high reliability.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS9997920B2System and method for islanding detection and prevention in distributed generation
Publication Date: 2018.06.12 SINEWATTS
  • US9997920B2 patent drawing
  • US9997920B2 patent drawing
  • US9997920B2 patent drawing

AI summary

Various examples are directed to systems and methods for detecting an islanding condition at an inverter configured to couple a distributed generation system to an electrical grid network. A controller may determine a command frequency and a command frequency variation. The controller may determine that the command frequency variation indicates a potential islanding condition and send to the inverter an instruction to disconnect the distributed generation system from the electrical grid network. When the distributed generation system is disconnected from the electrical grid network, the controller may determine whether the grid network is valid.