IT Equipment Replacement Criticality Scoring

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Retail businesses lack a systematic approach to manage and optimize the replacement of information technology (IT) equipment, relying on subjective opinions rather than objective data, which leads to inefficient use and increased costs.

Innovation Solution

A system and method that utilize objective data such as equipment age, usage frequency, sales revenue, and competitor information to compute a criticality score for each retail site, enabling proactive and predictive analysis for IT equipment needs, and automatically generate service requests for maintenance or replacement.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Device complexity

If subjective employee opinions and anecdotal evidence are used to determine IT equipment replacement, then administrative burden and cost monitoring are reduced, but measurement precision and decision accuracy deteriorate

Engineering Contradiction:
Improveadministrative burdenVSAvoiddecision accuracy
Core Design Contradiction:
Device complexityVSMeasurement precision

Solution Approach 1:

The patent replaces subjective human judgment mechanisms with an automated computational system that collects objective data from multiple sources (maintenance work orders, usage metrics, financial systems) and processes it through algorithms to generate data-driven replacement recommendations, thereby eliminating the trade-off between administrative effort and decision accuracy

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The system implements continuous feedback loops by monitoring actual equipment performance data, maintenance history, and usage patterns, then using this feedback to refine and update replacement prioritization scores, ensuring decisions are based on current objective evidence rather than subjective opinion

Inventive Principle:
Principle #23Feedback

2Productivity

If detailed monitoring and analysis of IT asset costs is implemented, then productivity and cost optimization are improved, but device complexity and administrative burden increase

Engineering Contradiction:
Improvecost optimizationVSAvoidsystem complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The patent creates a multi-functional system that simultaneously performs data collection from multiple sources (maintenance systems, usage metrics, financial databases), data processing, analytical computations, and report generation within a single integrated platform, improving productivity without proportionally increasing complexity

Inventive Principle:
Principle #6Universality (Multi-functionality)

Solution Approach 2:

The system automatically collects and processes data from connected enterprise systems without requiring manual intervention, and generates self-service replacement recommendations that businesses can implement based on objective criteria, reducing the administrative burden despite detailed monitoring

Inventive Principle:
Principle #25Self-service

3Device complexity

If IT equipment replacement decisions are delayed based on fixed cost assumptions, then administrative burden is reduced, but reliability of business operations deteriorates

Engineering Contradiction:
Improvemanagement complexityVSAvoidoperational reliability
Core Design Contradiction:
Device complexityVSReliability

Solution Approach 1:

The patent computes replacement prioritization scores in advance by analyzing current equipment status, historical maintenance patterns, and projected usage trends, enabling businesses to proactively schedule replacements before failures occur, thereby maintaining operational reliability without increasing management complexity

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system replaces reactive replacement decisions based on fixed cost assumptions with a predictive analytics engine that continuously monitors objective equipment data and generates timely replacement recommendations, ensuring operational reliability through data-driven timing rather than arbitrary schedules

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Data Source

PatentUS11182761B2Information technology equipment replacement calculation systems and methods
Publication Date: 2021.11.23 WALMART APOLLO LLC
  • US11182761B2 patent drawing
  • US11182761B2 patent drawing
  • US11182761B2 patent drawing

AI summary

Embodiments relate to systems and methods for assessing site-wide IT and other electronic equipment replacement criticality. A system generally includes a plurality of point-of-sale (POS) systems located at a corresponding plurality of retail sites, a centralized transaction database configured to receive datasets from each of the plurality of POS systems, a processor configured to group the plurality of retail sites according a predefined site type, determine averages for each field within the received datasets, compare the received datasets to the computed averages, multiply the comparisons by a weighting value, and at the weighted comparisons together to form a criticality score.