J-Lay Loader Boom for Shared Tubular and Accessory Handling
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Existing tubular installation systems for J-laying tubulars on drilling rigs and marine pipelay systems require separate and space-consuming equipment for handling tubulars and accessories, leading to a large footprint and inefficient use of resources.
Innovation Solution
A common loader device with pivotable tubular grippers and accessory handling means attached to the boom, allowing for shared hoist capacity and reduced footprint by using accessory supply rails and tower rails for efficient transfer between supply positions and the firing line.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Reliability
If separate equipment is used for handling tubulars and accessories, then each component can be optimized for its specific function, but the overall footprint and device complexity increase
Solution Approach 1:
The patent combines separate tubular handling equipment and accessory handling equipment into a single integrated loader device. The loader device includes a boom with tubular grippers for handling tubulars and accessory handling means (such as cranes or robotic manipulators) for handling accessories, all mounted on a common base. This merging reduces the overall footprint while maintaining the functional capabilities of both separate systems.
Solution Approach 2:
The loader device is designed as a universal platform that can perform multiple functions: it can handle both tubulars (using tubular grippers attached to the boom) and accessories (using accessory handling means). The boom can be positioned and operated to serve both tubular supply positions and accessory supply positions, making the single device versatile enough to replace multiple specialized devices.
2Adaptability or versatility
If separate equipment is used for handling tubulars and accessories, then each system can be independently optimized, but the device complexity and resource utilization efficiency decrease
Solution Approach 1:
The patent combines separate tubular handling equipment and accessory handling equipment into a single integrated loader device. The loader device includes a boom with tubular grippers for handling tubulars and accessory handling means (such as cranes or robotic manipulators) for handling accessories, all mounted on a common base. This merging reduces the overall footprint while maintaining the functional capabilities of both separate systems.
Solution Approach 2:
The loader device is designed as a universal platform that can perform multiple functions: it can handle both tubulars (using tubular grippers attached to the boom) and accessories (using accessory handling means). The boom can be positioned and operated to serve both tubular supply positions and accessory supply positions, making the single device versatile enough to replace multiple specialized devices.
3Productivity
If separate equipment is used for handling tubulars and accessories, then each system can operate independently, but the hoist capacity cannot be shared and space utilization decreases
Solution Approach 1:
The patent combines separate tubular handling equipment and accessory handling equipment into a single integrated loader device. The loader device includes a boom with tubular grippers for handling tubulars and accessory handling means (such as cranes or robotic manipulators) for handling accessories, all mounted on a common base. This merging reduces the overall footprint while maintaining the functional capabilities of both separate systems.
Solution Approach 2:
The loader device is designed as a universal platform that can perform multiple functions: it can handle both tubulars (using tubular grippers attached to the boom) and accessories (using accessory handling means). The boom can be positioned and operated to serve both tubular supply positions and accessory supply positions, making the single device versatile enough to replace multiple specialized devices.
Data Source
Figure 1a
Figure 1b
Figure 2
AI summary
The present invention relates to a tubular installation system (10) for J-laying tubulars comprising a J-lay tower structure (50), a tubulars supply system and a loader device comprising tubular grippers (21) and a boom (24) for transporting a tubular, an accessory supply system (58) and accessory handling means (55) for transporting an accessory between the essentially horizontal accessory supply position and the firing line. According to the invention, the accessory supply system (58) comprises accessory supply rails (58a, 58b, 201, 202), provided on the support, and in that the accessory supply rails are in line with the accessory handling means.