Job Execution Planning for Material Availability Constraints

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing systems cannot create an execution plan for jobs with common attributes when the materials or storage place is initially unsuitable, preventing job execution even if they become suitable later.

Innovation Solution

An information processing apparatus that acquires information on materials and storage place conditions before job execution, creating a plan to execute jobs in a time window where these conditions become suitable, by grouping jobs based on common attributes and allocating them to suitable time windows.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If jobs are executed based on material availability at creation time, then execution plan can be created immediately, but jobs cannot be executed even if materials become available later

Engineering Contradiction:
Improvejob execution capabilityVSAvoidwaiting time for material availability
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system performs preliminary actions by creating the execution plan in advance (grouping jobs by attributes) and setting up monitoring mechanisms before materials become available. The plan is prepared ready-to-execute, and the system proactively monitors material availability changes, allowing immediate execution once conditions are met without requiring re-planning.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The execution plan is made dynamic by allowing it to be updated when material availability changes. The system continuously monitors whether materials reach a state suitable for execution and automatically activates or modifies the execution plan accordingly, transforming a static plan into a flexible, adaptive schedule that responds to real-time conditions.

Inventive Principle:
Principle #15Dynamics

2Adaptability or versatility

If execution plan is created only when materials are suitable, then resource utilization is optimized, but jobs cannot be scheduled in advance

Engineering Contradiction:
Improveflexibility in schedulingVSAvoidjob execution efficiency
Core Design Contradiction:
Adaptability or versatilityVSProductivity

Solution Approach 1:

The system performs preliminary grouping of jobs by common attributes and creates a template execution plan in advance, even before material availability is confirmed. This preliminary structure allows rapid deployment once materials are available, combining advance preparation with adaptive execution based on actual resource conditions.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system changes the state parameter of the execution plan from 'pending' to 'active' when material availability conditions are met. By monitoring material states and triggering plan activation based on parameter changes (material availability), the system achieves both advance scheduling capability and adaptive resource utilization.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentUS11954392B2Information processing apparatus and non-transitory computer readable medium
Publication Date: 2024.04.09 FUJIFILM BUSINESS INNOVATION CORP
  • US11954392B2 patent drawing
  • US11954392B2 patent drawing
  • US11954392B2 patent drawing

AI summary

An information processing apparatus includes a processor configured to create a group of jobs to be executed that have a common attribute, acquire, before execution of the jobs, information on materials used for execution of the jobs or a storage place for storing products obtained as a result of execution of the jobs, the information indicating that the materials or the storage place, which is not suitable for execution of the jobs at a time of creation of the group, reaches a state suitable for execution of the jobs after creation of the group, and create an execution plan so that the jobs are executed per group in a time window in which the materials or the storage place reaches the state suitable for execution of the jobs by using the information.