Subsea Laydown Head Retrieval Arrangement

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The retrieval of a laydown head from a pipeline end section secured to a pipeline termination skid at the seabed is currently a complex and time-consuming process, requiring subsea mounting and operation of a lifting frame.

Innovation Solution

A detachable arrangement with a base frame, rigid supporting units, and a locking device that allows for controlled vertical movement and secure positioning of the laydown head, enabling its rapid and safe retrieval to a surface vessel without interfering with pipeline connection operations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If a lifting frame with chains and ROV operated chain hoists is used to retrieve the laydown head, then the laydown head can be disconnected and suspended, but the retrieval operation becomes complicated and time-consuming

Engineering Contradiction:
Improvesecure suspension of laydown headVSAvoidcomplexity of retrieval operation
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The invention extracts the essential function of laydown head retrieval by removing the complex lifting frame, chains, and ROV operated chain hoists system. Instead, it uses a simple retrieval device that integrates the suspension and lifting functions into a single compact unit that can be directly positioned under and lift the laydown head without the intermediary chains and hoists system.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The invention merges multiple functions (positioning, suspending, and lifting) into a single integrated retrieval device. The retrieval device combines the support structure, lifting mechanism, and suspension elements into one unified unit, eliminating the need for separate lifting frame, chains, and chain hoists that were previously required.

Inventive Principle:
Principle #5Merging (Combining)

2Reliability

If a lifting frame with multiple chains and ROV operated chain hoists is used, then the laydown head can be securely suspended, but the operation becomes time-consuming

Engineering Contradiction:
Improvesecure suspension of laydown headVSAvoidtime required for retrieval operation
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The invention extracts and eliminates the time-consuming elements of the previous system (multiple chains and ROV operated chain hoists) while retaining the essential function of secure suspension through a simplified retrieval device that achieves the same result more efficiently.

Inventive Principle:
Principle #2Taking out (Extraction)

Solution Approach 2:

The invention skips the lengthy process of deploying and operating multiple chains and chain hoists by using a retrieval device that can be quickly positioned and operated, significantly reducing the time required for the retrieval operation while maintaining secure suspension of the laydown head.

Inventive Principle:
Principle #21Skipping (Rushing through)

3Reliability

If subsea mounting operations are performed to secure the pipeline end section, then the pipeline can be connected, but additional time and operational complexity are required

Engineering Contradiction:
Improvesecure connection of pipelineVSAvoidtime for subsea mounting operation
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The retrieval device is mounted on the pipeline termination skid before the pipeline end section is lowered to the seabed. This preliminary mounting action allows the device to be in position and ready for immediate use once the pipeline is connected and the laydown head needs retrieval, eliminating the need for separate subsea mounting operations after pipeline connection.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The invention merges the mounting of the retrieval device with the pipeline installation process itself. By securing the retrieval device to the pipeline termination skid during the initial setup phase, the pipeline connection operations and retrieval device installation are combined into a single operational sequence, reducing total time and complexity.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentEP3008368B1Arrangement, system and method for retrieving a laydown head
Publication Date: 2019.10.23 VETCO GRAY SCANDINAVIA
  • EP3008368B1 patent drawingFigure 1~2
  • EP3008368B1 patent drawingFigure 3~4
  • EP3008368B1 patent drawingFigure 5~8

AI summary

The invention relates to an arrangement (1 ) to be used for retrieving a laydown head (2) to a surface vessel from a pipeline end section (3) that is secured to a pipeline termination skid (4) at the seabed. The arrangement is detachably mountable to the pipeline termination skid and comprises: - a base frame (10) configured to bear against the pipeline termination skid when the arrangement is mounted to the pipeline termination skid; and - one or more rigid supporting units (12a, 12b) provided on the base frame for supporting the laydown head from below, each supporting unit comprising an upwardly directed seat (13) for receiving the laydown head and an actuating device (14) for moving said seat in the vertical direction. The invention also relates to a system comprising such an arrangement and a pipeline termination skid, and a method for retrieving a laydown head by means of such an arrangement.