Load-Lock Gas Diffuser Layout for Faster Wafer Pressurization

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing load-lock chamber designs face challenges in reducing flow-induced particle contamination during the pressurization process in semiconductor wafer inspection, which can lead to defects and decreased yield, while also compromising system throughput due to slow pressurization operations.

Innovation Solution

A low-volume load-lock chamber design with a ceiling-mounted gas vent and a plate positioned between the gas vent and the wafer, optimized to divert gas flow perpendicular to the wafer, reducing flow-induced contamination and accelerating the pressurization process.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If gas is vented into the load-lock chamber during pressurization, then the chamber pressure increases and throughput improves, but particle contamination occurs on the wafer surface

Engineering Contradiction:
Improvepressurization speedVSAvoidparticle contamination
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

A gas diffuser is introduced as an intermediary component between the gas vent and the wafer. The diffuser disperses the gas flow into multiple smaller streams, reducing the direct impact velocity and preventing particles from being deposited onto the wafer surface during pressurization, thereby resolving the contradiction between fast pressurization and contamination prevention

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The gas flow parameters are changed by using a diffuser structure that transforms a single high-velocity gas jet into multiple lower-velocity streams. This parameter change reduces the kinetic energy of the gas flow, preventing particle contamination while maintaining the overall pressurization rate needed for high throughput

Inventive Principle:
Principle #35Parameter changes

2Loss of time

If the load-lock chamber volume is reduced to accelerate pressurization, then pressurization time decreases and throughput increases, but the chamber may not accommodate standard wafer sizes

Engineering Contradiction:
Improvepressurization timeVSAvoidchamber volume
Core Design Contradiction:
Loss of timeVSVolume of moving object

Solution Approach 1:

The load-lock chamber is designed with non-uniform volume distribution - the region above the wafer is minimized to reduce pressurization time, while the overall chamber volume is sufficient to accommodate standard wafer sizes. This local optimization allows fast pressurization without compromising wafer accommodation

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

The gas venting strategy is optimized by directing gas flow in specific patterns and using a diffuser to distribute flow in multiple directions. This dimensional approach to gas flow management allows efficient pressurization of a compact chamber volume while maintaining compatibility with standard wafer dimensions

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The solution effectively minimizes particle contamination and reduces pressurization time from 30 seconds to 15 seconds, maintaining high throughput and reducing the risk of defects, thereby improving the yield and robustness of the charged-particle inspection apparatus.

Implementation Method 1

a gas vent arranged at a ceiling of the chamber and configured to vent gas into the chamber with a flow rate of at least twenty normal liters per minute

Methodology Applied
Scientific EffectGas flow:

Implementation Method 2

a plate fixed to the ceiling between the gas vent and the wafer

Methodology Applied
Scientific EffectFlow diversion:

Data Source

PatentUS20240014053A1Charged-particle inspection apparatus
Publication Date: 2024.01.11 ASML NETHERLANDS BV
  • US20240014053A1 patent drawing
  • US20240014053A1 patent drawing
  • US20240014053A1 patent drawing

AI summary

A load-lock system may include a chamber enclosing a supporting structure configured to support a wafer; a gas vent arranged at a ceiling of the chamber and configured to vent gas into the chamber with a flow rate of at least twenty normal liters per minute; and a plate fixed to the ceiling between the gas vent and the wafer.