Local Search Supply Plan Creation for Resource Allocation
Find Innovative SolutionsGenerate Solutions
Solution Overview
Problem
Conventional supply chain management methods, such as order-by-order (OBO) and linear planning (LP), struggle to create optimal supply plans that balance quality, speed, and integer constraints, particularly in meeting multiple goods demands with limited resources.
Innovation Solution
A method and system utilizing a local search technique to create and evaluate multiple candidate supply plans, prioritizing demands and resource information to quickly establish an optimal supply plan that efficiently utilizes limited resources.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Speed
If order-by-order (OBO) technique is used to establish supply plans, then the speed of creating supply plans is improved, but the quality of supply plans deteriorates due to inability to solve resource allocation issues
Solution Approach 1:
The patent segments the supply plan creation process into multiple candidate supply plans, each representing different resource allocation scenarios. By evaluating multiple segmented plans rather than creating a single plan, the system achieves both speed (through efficient evaluation) and quality (through comparative selection).
Solution Approach 2:
The system changes parameters by creating multiple candidate supply plans with different resource allocation configurations. By varying the allocation parameters across multiple candidates and evaluating them, the system finds optimal solutions that balance speed and quality.
2Manufacturing precision
If linear planning (LP) technique is used to ensure optimal solutions, then the quality of supply plans is improved, but the time required to create supply plans increases and integer constraints become difficult to incorporate
Solution Approach 1:
Instead of performing full linear programming optimization which is time-consuming, the patent applies partial optimization by creating multiple candidate plans with modified resource allocations and evaluating them. This partial action approach achieves sufficient quality without the full time cost of complete LP optimization.
Solution Approach 2:
The system performs preliminary action by pre-generating multiple candidate supply plans with different resource allocation scenarios before final selection. This preliminary creation of alternatives allows for faster final decision-making compared to full optimization from scratch.
3Manufacturing precision
If multiple candidate supply plans are created and evaluated through local search technique, then the quality of supply plans is improved, but the complexity of the system increases
Solution Approach 1:
The patent segments the complex optimization problem into multiple manageable candidate supply plans. Each candidate represents a simplified scenario that can be evaluated independently, reducing the overall system complexity while maintaining solution quality through comparative evaluation.
4Productivity
If goods resources are reallocated by retrieving and reassigning resources already assigned to multiple goods demands, then the efficiency of resource utilization is improved, but the complexity of resource management increases
Solution Approach 1:
The system changes resource management parameters by creating multiple candidate supply plans with different resource allocation configurations. By evaluating these different parameter configurations, the system efficiently reallocates resources to optimal uses without requiring complex real-time management, as allocations are determined through candidate evaluation and selection.
Data Source
AI summary
A method for creating an optimal supply plan is provided. The method may include creating supply plans for multiple goods demands, creating a plurality of candidate supply plans by modifying at least a part of the supply plans based on priorities and goods resources information of the multiple goods demands, selecting a first candidate supply plan from among the plurality of candidate supply plans based on results of evaluation of the plurality of candidate supply plans, and replacing at least a part of the supply plans with the first candidate supply plan.


