Problem

Existing systems fail to efficiently generate operation plans for electrically powered working machines, particularly in locations where power-feeding equipment is limited or absent, leading to reduced utilization rates and increased operational inefficiencies.

Innovation Solution

An operation plan generation device that acquires working location information and power-feeding equipment conditions to generate and output operation plans, including utilization rates and required machine numbers, considering various conditions such as power-feeding equipment availability and location, to optimize working machine operations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If operation plans are generated without considering power-feeding equipment conditions, then generation speed is fast, but working machine utilization rate decreases

Engineering Contradiction:
Improveworking machine utilization rateVSAvoidoperation plan generation complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The system performs preliminary acquisition of power-feeding equipment conditions and working location information before generating operation plans. By pre-collecting data about charger locations, battery capacities, and working conditions, the system avoids complex real-time calculations and enables efficient plan generation that considers power constraints without sacrificing productivity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The operation plan generation unit automatically integrates power-feeding equipment conditions into plan creation without requiring manual intervention. The system self-adjusts routing and scheduling based on acquired power infrastructure data, eliminating the need for separate manual optimization processes while improving utilization rates.

Inventive Principle:
Principle #25Self-service

2Productivity

If power-feeding equipment conditions are considered in operation plan generation, then working machine utilization rate improves, but information processing complexity increases

Engineering Contradiction:
Improveoperational efficiencyVSAvoidpower-feeding equipment condition assessment
Core Design Contradiction:
ProductivityVSDifficulty of detecting and measuring

Solution Approach 1:

The system extracts power-feeding equipment conditions as separate, standardized data elements (charger locations, power capacities, availability) before integrating them into operation plan generation. This extraction approach simplifies the assessment process by isolating power-related parameters from other operational constraints, making them easier to detect and measure independently.

Inventive Principle:
Principle #2Taking out (Extraction)

3Productivity

If multiple conditions are considered for operation plan generation, then operational efficiency improves, but calculation time increases

Engineering Contradiction:
Improveoperational efficiencyVSAvoidplan generation time
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The system performs preliminary acquisition and preprocessing of multiple condition parameters (power-feeding equipment status, working location characteristics, machine specifications) before the actual plan generation. By preparing these data elements in advance, the system reduces calculation time during plan creation while still considering all necessary conditions for operational efficiency.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20250307733A1Operation plan generation device, operation plan generation method, and computer-readable storage medium
Publication Date: 2025.10.02 HONDA MOTOR CO LTD
  • US20250307733A1 patent drawing
  • US20250307733A1 patent drawing
  • US20250307733A1 patent drawing

AI summary

Solution: Provided is an operation plan generation device which generates information indicating an operation plan for a working machine which drives using electrical power to perform a predefined work by the working machine.The operation plan generation device acquires working location information including route information indicating a drivable path set on a map for the working machine in a working location where the working machine engages a work; acquires information indicating a condition regarding power-feeding equipment that can feed electrical power to the working machine installed in the working location; based on the working location information and a plurality of conditions different from each other, each condition being identical to the condition, generates information indicating the operation plan in each of the plurality of conditions.