Maintenance Management Device for Replacement Parts

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current maintenance management systems face challenges in accurately estimating the replacement timing of device parts due to large data sizes in regular reports, leading to increased communication load and potential premature part failure.

Innovation Solution

A maintenance management device that receives regular reports on part deterioration, identifies parts requiring temporary reports before the next regular interval, and requests these temporary reports to improve estimation accuracy and reduce communication load.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If the interval of regular reports is shortened to improve replacement timing estimation accuracy, then the reliability of part replacement management is improved, but the communication load and communication cost increase

Engineering Contradiction:
Improvereplacement timing estimation accuracyVSAvoidcommunication load
Core Design Contradiction:
ReliabilityVSLoss of energy

Solution Approach 1:

The patent segments the monitoring of replacement parts into two levels: regular reports covering all parts at standard intervals, and temporary reports for specifically identified parts requiring closer monitoring. This segmentation allows the system to maintain high reliability for parts needing frequent monitoring without increasing communication load for all parts uniformly.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent applies local quality by differentiating the reporting frequency and detail based on individual part characteristics and risk levels. High-risk parts with usage patterns suggesting potential premature failure receive temporary reports with shorter intervals, while low-risk parts continue with standard regular report intervals, optimizing communication load distribution.

Inventive Principle:
Principle #3Local quality

2Measurement precision

If temporary reports are requested for specific replacement parts, then the measurement precision of deterioration information is improved, but the device complexity increases

Engineering Contradiction:
Improvedeterioration information accuracyVSAvoidreport management complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The patent applies preliminary action by analyzing regular report data in advance to identify parts that may require temporary reporting before actual deterioration occurs. The maintenance management device predicts which parts need closer monitoring based on usage patterns and historical data, then proactively requests temporary reports for those specific parts, improving measurement precision without reactive complexity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The patent implements feedback mechanisms where the maintenance management device continuously analyzes temporary report data and adjusts future monitoring strategies. The system learns from temporary report outcomes to refine its predictions about which parts need temporary reporting, reducing unnecessary temporary reports over time and managing complexity through adaptive optimization.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS10445033B2Maintenance management device, device to be maintained and non-transitory recording medium storing a computer readable program
Publication Date: 2019.10.15 KONICA MINOLTA INC
  • US10445033B2 patent drawing
  • US10445033B2 patent drawing
  • US10445033B2 patent drawing

AI summary

Disclosed is a maintenance management device, including: a communicator that communicates with a device to be maintained; and a hardware processor that: regularly receives a regular report indicating deterioration/exhaustion information for a plurality of replacement parts, from the device to be maintained; specifies the replacement part for which the deterioration/exhaustion information is required before a next regular report is received and a timing of obtaining the deterioration/exhaustion information for the specified replacement part, in accordance with the received regular report; and requests a temporary report indicating the deterioration/exhaustion information for the specified replacement part, to the device to be maintained at the specified timing, and obtaining the temporary report.