Maintenance Train for Continuous Railway Track Renewal

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing methods for renovating railway tracks are inefficient as they require separate machines for substructure and superstructure renewal, leading to logistical challenges in transporting materials and disrupting workflow.

Innovation Solution

A work train equipped with conveyor belt technology and gantry cranes that allows for simultaneous renewal of track substructure and superstructure, enabling continuous workflow by transporting and installing materials below or above sleepers, with adjustable conveyor belts and optional intermediate buffering.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of manufacture

If separate machines are used for substructure and superstructure renewal, then each machine can be specialized for its specific task, but logistical challenges in transporting materials and workflow disruptions occur

Engineering Contradiction:
Improvespecialization of machinesVSAvoidworkflow continuity
Core Design Contradiction:
Ease of manufactureVSProductivity

Solution Approach 1:

The patent combines multiple separate renewal machines into a single integrated work train that can simultaneously renew both the track substructure (ballast) and superstructure (sleepers and rails). The work train includes a ballast renewal unit, a sleeper replacement unit, and a rail replacement unit that operate together on the same track section, eliminating the need to switch between separate machines and maintaining continuous workflow.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The work train is designed as a multi-functional system that performs multiple renewal tasks simultaneously. Different units within the work train handle different aspects of track renewal (ballast, sleepers, rails), allowing the same piece of equipment to accomplish what previously required multiple separate machines, thereby improving productivity while maintaining specialization through modular units.

Inventive Principle:
Principle #6Universality (Multi-functionality)

2Ease of operation

If materials are transported to and from the site using separate logistics, then each machine can operate independently, but transport efficiency decreases and logistical problems arise

Engineering Contradiction:
Improveindependent machine operationVSAvoidmaterial transport time
Core Design Contradiction:
Ease of operationVSLoss of time

Solution Approach 1:

The work train merges the logistics systems of multiple machines into a unified material handling system. Conveyor belts and transfer mechanisms are shared between different renewal units, allowing materials like sleepers and ballast to be transported efficiently between storage areas and working positions without requiring separate transport operations for each machine.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

The patent introduces intermediary conveyor systems and transfer mechanisms that act as mediators between material storage and the various renewal units. These intermediary systems facilitate smooth material flow between different parts of the work train, reducing transport time and eliminating the need for repeated loading and unloading operations that would occur with independent machine logistics.

Inventive Principle:
Principle #24Intermediary (Mediator)

3Productivity

If conveyor belts are used to transport materials below or above sleepers, then continuous workflow is enabled, but device complexity increases

Engineering Contradiction:
Improvecontinuous workflowVSAvoidconveyor belt system complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The conveyor system is segmented into multiple independent sections, each handling specific material transport tasks. Rather than one complex continuous conveyor, the system uses multiple simpler conveyor segments that can be independently controlled and maintained, reducing overall system complexity while maintaining continuous material flow capability.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The patent utilizes both horizontal and vertical dimensions for material transport by positioning conveyor belts at different levels (above and below the sleeper layer). This three-dimensional arrangement allows materials to be transported simultaneously at different heights without interfering with each other, enabling continuous workflow while distributing the complexity across multiple simpler conveyor paths rather than one complex system.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Data Source

PatentEP2130973B1Maintenance train for improving the track and the rail substructure of a railway track
Publication Date: 2014.02.12 ZURCHER RALF
  • EP2130973B1 patent drawingFigure 1~2
  • EP2130973B1 patent drawingFigure 3
  • EP2130973B1 patent drawingFigure 4

AI summary

The method involves exchanging individual rails (5) of rail tracks (3) using a maintenance train (1) with multiple maintenance carriages (6). The maintenance carriages continuously move forward on the rail tracks in a continuous operating cycle. Sleepers (4) of the rail tracks are exchanged, and the ballast of the track substructure (2) is exchanged or cleaned.