Masonry Veneer Wall Tie with Insulation Protection

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing wall tie systems for masonry veneers in building construction often compress and damage building insulation while securing the veneer to the wall, lacking effective solutions to inhibit insulation compression and provide adequate support.

Innovation Solution

A wall tie assembly comprising a washer and a tie member, such as a strap or wire, with a fastener that penetrates through the insulation to secure the veneer to the wall without compressing it, utilizing a double-thread differential pitch fastener for enhanced engagement and a washer with projections for initial retention on the insulation, allowing the tie member to be positioned within the mortar for support.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Strength

If existing wall tie systems are used to secure masonry veneer to the wall, then the veneer is anchored to the wall, but the building insulation is compressed and damaged

Engineering Contradiction:
Improveveneer anchoring strengthVSAvoidinsulation compression and damage
Core Design Contradiction:
StrengthVSObject-affected harmful factors

Solution Approach 1:

A foam block intermediary is introduced between the masonry veneer and the insulation layer. The foam block receives compression forces from the veneer while its cellular structure allows it to compress without damaging the insulation, thereby mediating the interaction between the veneer and insulation to prevent insulation damage while maintaining anchoring strength

Inventive Principle:
Principle #24Intermediary (Mediator)

Solution Approach 2:

The foam block is installed beforehand as a cushioning element between the veneer and insulation. This pre-positioned cushioning layer is designed to absorb and distribute compression forces, protecting the insulation from direct contact and damage by the anchoring system before any compression occurs

Inventive Principle:
Principle #11Beforehand cushioning (Prior cushioning)

2Reliability

If the tie member is secured firmly to the wall, then compression and tension support is provided, but the insulation is substantially compressed

Engineering Contradiction:
Improvecompression and tension supportVSAvoidinsulation compression
Core Design Contradiction:
ReliabilityVSObject-affected harmful factors

Solution Approach 1:

The foam block serves as a mediator that allows the tie member to be firmly secured to the wall while preventing direct compression of the insulation. The foam block's compressible cellular structure absorbs the compression forces, enabling reliable anchoring without insulation damage

Inventive Principle:
Principle #24Intermediary (Mediator)

3Strength

If conventional fasteners are used to attach the washer to the wall, then the washer is secured, but the insulation is damaged during installation

Engineering Contradiction:
Improvewasher attachment strengthVSAvoidinsulation damage during installation
Core Design Contradiction:
StrengthVSObject-affected harmful factors

Solution Approach 1:

The foam block is positioned between the washer and insulation during installation, acting as a protective intermediary. This allows conventional fasteners to be used to securely attach the washer while the foam block prevents the fasteners from directly damaging the insulation

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS10876285B1Masonry veneer wall tie apparatus and method for building construction
Publication Date: 2020.12.29 ALTENLOH BRINCK & US
  • US10876285B1 patent drawing
  • US10876285B1 patent drawing
  • US10876285B1 patent drawing

AI summary

A wall tie assembly is provided for use in building construction for connecting a masonry veneer, such as brick or stone, to a building wall while inhibiting compression of building insulation disposed between an internal wall and the veneer. The wall tie assembly includes a washer through which a fastener is disposed and couples to a tie member. The fastener fixes to the structural portion of the wall through the insulation, such that the washer may interface with the exterior surface of the insulation in a manner to form a seal that prevents moisture and air from penetrating through the aperture formed in a weather barrier of the internal wall by the fastener. The tie member attaches between the head of the fastener and the washer and is bent for positioning within mortar of the masonry veneer of the wall.