Master Unit Control Notification for Power System Monitoring

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Conventional control and monitoring systems for power systems face issues where the information used for judging controllability becomes outdated during control execution, leading to potential improper control and unnecessary multiple control operations among input/output terminal devices.

Innovation Solution

The master unit acquires the necessary information for judging controllability at the time of control object selection notification and sends a control object selection notification containing specifying information to both selected and non-selected input/output terminal devices, ensuring the information is up-to-date and preventing multiple control operations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of time

If information is collected before control object selection (conventional method 1), then control object can be selected based on available information, but the information becomes outdated by the time control is executed

Engineering Contradiction:
Improvetime delay between information collection and control executionVSAvoidaccuracy of controllability judgment
Core Design Contradiction:
Loss of timeVSReliability

Solution Approach 1:

The master unit sends control object selection notifications to all input/output terminal devices in advance, before determining which device will actually execute the control. This preliminary notification allows all devices to prepare and respond simultaneously, eliminating the time delay between information collection and control execution while ensuring information freshness.

Inventive Principle:
Principle #10Preliminary action

2Object-generated harmful factors

If control object selection notification is sent only to selected input/output terminal device, then communication is minimized, but multiple control operations may occur simultaneously among non-selected devices

Engineering Contradiction:
Improvemultiple control operationsVSAvoidcommunication traffic
Core Design Contradiction:
Object-generated harmful factorsVSQuantity of substance

Solution Approach 1:

The master unit sends control object selection notifications to all input/output terminal devices, including non-selected ones. The non-selected devices receive the notification and proactively inhibit their control operations in advance, preventing multiple simultaneous control operations before they can occur. This approach increases communication traffic slightly but ensures system safety and prevents harmful multiple control actions.

Inventive Principle:
Principle #9Preliminary anti-action

3Reliability

If information collection is performed after control object selection (conventional method 2), then information is fresher, but control execution is delayed further

Engineering Contradiction:
Improvefreshness of controllability informationVSAvoidtotal control execution time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The master unit sends control object selection notifications to all input/output terminal devices in advance, before determining which device will execute the control. This allows all devices to collect and prepare their information simultaneously with the selection process, ensuring information freshness without delaying control execution. The parallel execution of notification and information collection eliminates the sequential delay inherent in conventional methods.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS7389327B2Control and monitoring system for power system
Publication Date: 2008.06.17 MITSUBISHI ELECTRIC CORP
  • US7389327B2 patent drawing
  • US7389327B2 patent drawing
  • US7389327B2 patent drawing

AI summary

The object of the present invention is to make information necessary for judging whether control output is possible closer to the latest information than in the conventional method or made the latest, and shorten the time from control start to control execution. In a control and monitoring system for a power system which controls monitoring control objects by supplying a control instruction from a master unit 6 to a plurality of input/output terminal devices BCU1, BCU2, and so on provided for each of the plurality of monitoring control objects in a power system, the master unit 6 starts operations to acquire information necessary for judging whether control output to the input/output terminal devices BCU1, BCU2, and so on is possible at the time of control object selection notification from the master unit 6 to the input/output terminal devices BCU1, BCU2, and so on.