Mate Line Closure Flaps for Repeated WRB Access and Sealing

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The frequent opening and closing of mate lines in building construction leads to deterioration of the vapor-permeable water-resistant barrier (WRB) sheet, causing integrity and performance issues due to staple holes and wrinkles.

Innovation Solution

A method involving the preparation and use of vertical and horizontal closure flaps extending beyond the mate lines, supported by rigid strips and secured with fasteners, allowing for controlled access and sealing to maintain WRB integrity.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If the WRB sheet is opened and closed multiple times to access mate lines for service installation, then access to mate lines is enabled, but the WRB sheet deteriorates due to staple holes and wrinkles

Engineering Contradiction:
Improveaccess to mate linesVSAvoidintegrity of WRB sheet
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The WRB sheet is segmented into a main body portion and a separate flap portion. The flap can be independently opened and closed to access the mate line, while the main body remains intact. This segmentation allows repeated access without compromising the overall integrity of the WRB sheet.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The flap is extracted from the main WRB sheet as a separate, movable component. This extracted portion can be opened and closed repeatedly to provide access to the mate line for service installations, while the main WRB sheet maintains its integrity and weather-resistant function.

Inventive Principle:
Principle #2Taking out (Extraction)

2Productivity

If the WRB sheet is repeatedly opened and closed to allow service installations, then service access is enabled, but wrinkles and staple holes accumulate in the WRB sheet

Engineering Contradiction:
Improveservice installation efficiencyVSAvoidwrinkles and staple holes in WRB
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The WRB sheet is divided into a permanent main body and a temporary flap. The flap undergoes repeated opening and closing operations during service installation, while the main body remains undisturbed. This segmentation confines the harmful effects of repeated operations to only the flap portion.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The flap is extracted as a separate, sacrificial element that absorbs the mechanical stress and damage from repeated opening and closing. This extracted portion can be replaced or repaired without affecting the main WRB sheet, thereby maintaining the overall weather-resistant barrier integrity.

Inventive Principle:
Principle #2Taking out (Extraction)

3Ease of operation

If the mate line is kept open for service installations, then access is maintained, but water infiltration risk increases

Engineering Contradiction:
Improvemate line accessibilityVSAvoidwater infiltration
Core Design Contradiction:
Ease of operationVSObject-affected harmful factors

Solution Approach 1:

The flap is designed to be dynamically movable between open and closed positions. When service installations are complete, the flap is closed to restore the weather-resistant barrier and prevent water infiltration. The dynamic nature of the flap allows it to adapt between providing access and providing protection.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The flap acts as an intermediary element between the interior and exterior environments at the mate line. When closed, it mediates to prevent water infiltration while still allowing the mate line to remain accessible for future service installations by simply opening the flap.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS11795704B2Method for covering and accessing mate lines during building construction
Publication Date: 2023.10.24 DUPONT SAFETY & CONSTRUCTION INC
  • US11795704B2 patent drawing
  • US11795704B2 patent drawing
  • US11795704B2 patent drawing

AI summary

A process for covering, protecting and providing access to mate lines during building construction comprising the steps of preparing a vertical and horizontal mate line closure flap, carrying out a vertical and horizontal mate line access process, carrying out a vertical and horizontal mate line closing process, repeating the vertical and horizontal mate line access and closing processes as required, and carrying out a vertical and horizontal mate line sealing process to complete the building weatherization.