MDT Measurement Control for Downlink-Only Cells

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Inefficient collection of information for optimal area design in downlink-only cells due to unnecessary measurements by UE in Immediate MDT, leading to interference and resource wastage.

Innovation Solution

A system where a base station transmits reporting condition information to a terminal apparatus, enabling the determination of initiation or termination of MDT measurements for downlink-only cells based on measurement thresholds, ensuring that measurements are only conducted within the cell's coverage area.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of information

If UE performs Immediate MDT measurements in downlink-only cells, then coverage information can be collected, but unnecessary measurements are performed outside the cell coverage area leading to resource wastage and interference

Engineering Contradiction:
Improvecoverage information collection efficiencyVSAvoidmeasurement resource wastage
Core Design Contradiction:
Loss of informationVSLoss of energy

Solution Approach 1:

The patent applies local quality by making the MDT measurement configuration cell-specific. The base station determines whether to configure Immediate MDT measurements based on whether the UE is actually within the cell coverage area. This localized approach ensures measurements are only performed where relevant (within coverage) rather than universally across all cells, thereby eliminating unnecessary resource consumption while maintaining effective coverage information collection.

Inventive Principle:
Principle #3Local quality

2Loss of information

If UE performs measurements in downlink-only cells, then area design information can be obtained, but interference with other cells may occur due to unnecessary coverage extension

Engineering Contradiction:
Improvearea design informationVSAvoidinterference with other cells
Core Design Contradiction:
Loss of informationVSObject-affected harmful factors

Solution Approach 1:

The patent implements preliminary anti-action by having the base station proactively determine whether the UE is within its coverage area before configuring Immediate MDT measurements. This preemptive check prevents the UE from performing measurements that would extend into other cells' coverage areas, thereby preventing interference before it occurs. The base station uses uplink signal detection to verify UE location and only enables measurements when appropriate, counteracting potential interference issues in advance.

Inventive Principle:
Principle #9Preliminary anti-action

3Extent of automation

If Immediate MDT measurements are configured for downlink-only cells, then MDT functionality can be implemented, but unnecessary periodic measurements and event trigger measurements are performed

Engineering Contradiction:
ImproveMDT functionalityVSAvoidmeasurement collection efficiency
Core Design Contradiction:
Extent of automationVSProductivity

Solution Approach 1:

The patent applies partial action by selectively enabling Immediate MDT measurements only when the UE is determined to be within the cell coverage area. Instead of configuring measurements unconditionally for all downlink-only cells, the base station performs a partial configuration based on actual UE location. This selective approach maintains full MDT functionality where needed while avoiding excessive measurements elsewhere, thereby improving overall measurement collection efficiency.

Inventive Principle:
Principle #16Partial or excessive action

Data Source

PatentUS10716009B2Apparatus, method, and system relating to minimization of drive tests (MDT) measurements
Publication Date: 2020.07.14 NEC CORP
  • US10716009B2 patent drawing
  • US10716009B2 patent drawing
  • US10716009B2 patent drawing

AI summary

To enable more efficient collection of information for optimal area design targeting a downlink only cell. An apparatus in the present invention includes: an information acquisition unit configured to acquire reporting condition information regarding a condition of reporting performed by a terminal apparatus to a base station; and a communication processing unit configured to transmit the reporting condition information to the terminal apparatus. The reporting is reporting to be used for determining initiation or termination of Minimization of Drive Tests (MDT) measurements for a downlink only cell.