Medium Processing Apparatus Maintenance Scheduling

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In recording systems, simultaneous maintenance and post-processing operations lead to temporary stops in medium transport, causing productivity losses due to deceleration and acceleration, which negatively impact the overall efficiency of the system.

Innovation Solution

A method for controlling the medium processing apparatus where maintenance is performed after the last recorded medium is stacked, allowing post-processing to utilize blank times and maintain continuous transport, thereby reducing productivity losses and avoiding transport stoppages.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If maintenance and post-processing are simultaneously started, then both operations can be performed without waiting, but medium transport must be stopped causing productivity loss

Engineering Contradiction:
ImproveproductivityVSAvoidtemporal loss due to deceleration and acceleration
Core Design Contradiction:
ProductivityVSLoss of time

Solution Approach 1:

The controller determines in advance whether to execute post-processing based on the timing of maintenance operations. By predicting the timing of maintenance and pre-planning the post-processing schedule, the system avoids transport stoppages and maintains continuous medium transport, thereby resolving the contradiction between performing maintenance and maintaining productivity.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system dynamically adjusts the post-processing timing based on real-time maintenance status. When maintenance is detected or predicted, the controller flexibly schedules post-processing operations to occur during maintenance periods rather than simultaneously, allowing the transport system to maintain continuous operation and avoiding the temporal losses associated with stopping and restarting.

Inventive Principle:
Principle #15Dynamics

2Productivity

If post-processing is executed during maintenance blank time, then productivity is improved, but transport stoppage occurs

Engineering Contradiction:
ImproveproductivityVSAvoidcontinuous transport
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The controller predicts maintenance timing and pre-determines when post-processing should be executed. By planning post-processing to occur during predicted maintenance blank times rather than simultaneously with maintenance operations, the system maintains continuous medium transport while still utilizing available time for post-processing, thus resolving the contradiction between productivity improvement and transport reliability.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS11919295B2Method for controlling medium processing apparatus, method for controlling recording system, post-processing apparatus, and recording system
Publication Date: 2024.03.05 SEIKO EPSON CORP
  • US11919295B2 patent drawing
  • US11919295B2 patent drawing
  • US11919295B2 patent drawing

AI summary

A medium processing apparatus includes an intermediate stacker on which media recorded by a recording apparatus are stacked, the recording apparatus including a liquid ejection head which performs recording by ejecting liquid to media and a maintenance apparatus which performs maintenance of the liquid ejection head, and a processor which executes a process on the media received by the intermediate stacker. The medium processing apparatus executes the process after a medium which is last recorded before the maintenance is stacked on the intermediate stacker.