Memory Circuit Voltage Switching for Low-Leakage Standby

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing electronic devices consume unnecessary power in standby mode due to circuit blocks receiving high operating voltages, leading to increased power consumption and leakage current.

Innovation Solution

Implementing switch sets that provide different voltage levels to circuit blocks in normal and standby modes, with higher voltages in normal mode and lower voltages in standby mode to reduce power consumption.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If circuit blocks receive high operating voltage in standby mode to maintain operation, then operational readiness is preserved, but power consumption and leakage current remain high

Engineering Contradiction:
Improveoperational readinessVSAvoidpower consumption
Core Design Contradiction:
ReliabilityVSUse of energy by moving object

Solution Approach 1:

The patent applies dynamics by making the voltage supply adaptive rather than static. The switch sets dynamically adjust the voltage level provided to circuit blocks based on operational mode (normal or standby), enabling the system to transition between high voltage for full operation and low voltage for power-saving standby while maintaining operational readiness when needed.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The patent changes the voltage parameter from a fixed high level to a variable level that adapts to operational requirements. By providing different voltage levels (first voltage in normal mode, second voltage in standby mode) to circuit blocks, the system optimizes power consumption while preserving the ability to quickly resume full operation.

Inventive Principle:
Principle #35Parameter changes

2Reliability

If circuit blocks receive high operating voltage in standby mode, then operational capability is maintained, but leakage current remains above acceptable levels

Engineering Contradiction:
Improveoperational capabilityVSAvoidleakage current
Core Design Contradiction:
ReliabilityVSObject-generated harmful factors

Solution Approach 1:

The switch sets enable dynamic adjustment of voltage supply, transitioning from static high voltage to adaptive voltage levels. In standby mode, the system dynamically switches to providing lower second voltage through the switch sets, reducing leakage current while maintaining sufficient operational capability for quick resume.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The patent changes the voltage parameter to have different values based on operational state. By providing a second voltage with a lower voltage value than the first voltage during standby mode, the system reduces leakage current while preserving operational capability, and can quickly switch back to first voltage when full operation is required.

Inventive Principle:
Principle #35Parameter changes

Data Source

PatentUS20260038545A1Electric device and memory device
Publication Date: 2026.02.05 NAN YA TECH
  • US20260038545A1 patent drawing
  • US20260038545A1 patent drawing
  • US20260038545A1 patent drawing

AI summary

An electric device includes a plurality of circuit blocks and a plurality of switch sets. The circuit blocks are respectively coupled to the switch sets. The switch sets provide a first voltage to respectively corresponding circuit blocks in a normal mode. The switch sets respectively provide a plurality of second voltages to corresponding circuit blocks in a standby mode, wherein a voltage value of the first voltage is greater than a voltage value of each of the second voltages.