Micro-Trench Cable Placement With Immediate Wall Stabilization

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The high cost and time required for excavating and restoring road layers to install fiber optic networks in residential areas, as well as the challenges of crossing gardens and obtaining permissions, hinder the expansion of these networks.

Innovation Solution

A machine for sawing micro trenches and placing ducts/cables that includes a saw blade and a stabilizing device with guiding means, allowing for simultaneous trench cutting and cable placement before the trench collapses, reducing costs and time by maintaining trench stability and preserving cable order.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If traditional excavation and restoration methods are used to install fiber optic networks, then the network infrastructure can be established, but the cost and time required for excavating and restoring road layers increases significantly

Engineering Contradiction:
Improvenetwork infrastructure establishmentVSAvoidexcavation and restoration time
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The patent divides the installation process into distinct functional modules: a saw blade for cutting trenches, a stabilizing device for maintaining trench walls, and guiding means for cable placement. This segmentation allows each component to perform its specific function efficiently, reducing overall installation time while maintaining infrastructure reliability

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The stabilizing device is positioned immediately behind the saw blade to prevent trench wall collapse before cable placement occurs. This preliminary stabilization action ensures the trench remains open and stable for cable insertion, eliminating the need for delayed stabilization or trench reopening, thus reducing total installation time

Inventive Principle:
Principle #10Preliminary action

2Reliability

If traditional excavation methods are used, then fiber optic networks can be installed, but the cost of road layer restoration increases

Engineering Contradiction:
Improvenetwork infrastructure establishmentVSAvoidroad layer restoration cost
Core Design Contradiction:
ReliabilityVSEase of manufacture

Solution Approach 1:

The patent creates a localized stable environment within the trench using the stabilizing device, which has stabilizing elements that contact only the specific portions of the trench wall that are prone to collapse. This localized stabilization reduces the need for extensive road layer restoration while ensuring the trench remains open for cable placement

Inventive Principle:
Principle #3Local quality

Solution Approach 2:

The stabilizing device acts as an intermediary between the trench walls and the cable placement process. It provides mechanical support to the trench walls during the critical period when cables are being inserted, preventing collapse without requiring full road layer restoration, thereby reducing restoration costs

Inventive Principle:
Principle #24Intermediary (Mediator)

3Device complexity

If trench stabilization is not implemented during cable placement, then the device complexity is reduced, but the trench walls collapse and stones are wedged into the trench preventing cable installation

Engineering Contradiction:
Improvestabilizing device structureVSAvoidcable placement feasibility
Core Design Contradiction:
Device complexityVSEase of operation

Solution Approach 1:

The stabilizing device is designed with multi-functionality: it provides trench wall stabilization, guides cable placement, and prevents stone intrusion. By combining these functions into a single device, the patent reduces overall system complexity while ensuring cable placement feasibility, as the stabilizing elements are integrated with the guiding means

Inventive Principle:
Principle #6Universality (Multi-functionality)

4Productivity

If multiple ducts/cables are placed simultaneously without guiding means, then the installation speed increases, but the order of ducts/cables is lost and placement precision decreases

Engineering Contradiction:
Improvecable placement speedVSAvoidduct/cable placement order and position
Core Design Contradiction:
ProductivityVSManufacturing precision

Solution Approach 1:

The guiding means within the stabilizing device automatically maintains the correct order and position of multiple ducts/cables as they are placed simultaneously. The guiding elements self-adjust to guide each cable to its proper location without requiring external intervention or complex coordination systems, thus maintaining precision while enabling high-speed simultaneous placement

Inventive Principle:
Principle #25Self-service

Data Source

PatentEP2638608B1Machine for sawing trenches and placing ducts/cables
Publication Date: 2024.05.15 HUSQVARNA AB
  • EP2638608B1 patent drawingFigure 1~2
  • EP2638608B1 patent drawingFigure 3a
  • EP2638608B1 patent drawingFigure 3b

AI summary

The present invention relates to a machine arranged for sawing micro trenches and placing ducts/communication cables in micro trenches, said machine comprising a saw blade arranged for sawing a micro trench in an area; said machine further comprises a stabilizing device arranged for stabilizing the walls of said micro trench when placing ducts/communication cables into said micro trench, said stabilizing device being positioned immediately behind said saw blade in said micro trench, and said stabilizing device comprising guiding means for guiding at least one duct/communication cable when placed into said micro trench.