Mining Machine Route Specification via Node-Based Position Correction

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing mining machine operation simulation systems struggle to accurately distinguish and specify the route traveled by mining machines in mines, which is crucial for improving productivity and driver instruction, due to difficulties in accurately determining the route taken by the machines.

Innovation Solution

A mining machine management system that includes a position information detection unit and a determination unit to detect and correct position information, determining route identity based on nodes and load states, ensuring accurate route specification.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Measurement precision

If operation simulation systems are used to track mining machines, then productivity analysis and driver instruction can be performed, but the accuracy in distinguishing and specifying the route traveled by the mining machine is insufficient

Engineering Contradiction:
Improveroute specification accuracyVSAvoidroute distinction accuracy
Core Design Contradiction:
Measurement precisionVSReliability

Solution Approach 1:

The route is segmented into multiple nodes representing key positions (departure position, loading position, discharging position, and intermediate positions). By dividing the continuous route into discrete segments connected by nodes, the system can accurately track and specify the mining machine's path through the mine, resolving the issue of insufficient route distinction accuracy.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system uses feedback from position information detection units to continuously update and correct the mining machine's location relative to the predefined nodes. This feedback mechanism enables real-time route specification and allows the system to distinguish whether the machine is traveling on the outbound route (to loading position) or inbound route (from discharging position), thereby improving both measurement precision and reliability.

Inventive Principle:
Principle #23Feedback

2Loss of information

If position information is collected continuously to track the mining machine, then route analysis can be performed, but position errors accumulate without correction

Engineering Contradiction:
Improveposition information accuracyVSAvoidnode position accuracy
Core Design Contradiction:
Loss of informationVSMeasurement precision

Solution Approach 1:

The system pre-defines nodes at every predetermined distance along the expected route before the mining machine begins operation. These nodes serve as reference points that are established in advance, allowing the system to compare actual position information against known correct locations and correct accumulated position errors.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The determination unit continuously compares detected position information with the predefined node positions and corrects node positions when discrepancies are detected. This feedback loop prevents position information accuracy degradation by regularly recalibrating the node positions based on actual measurements, thereby maintaining measurement precision over time.

Inventive Principle:
Principle #23Feedback

Data Source

PatentUS9243923B2Mining machine management system and mining machine management method
Publication Date: 2016.01.26 KOMATSU LTD
  • US9243923B2 patent drawing
  • US9243923B2 patent drawing
  • US9243923B2 patent drawing

AI summary

A mining machine management system includes: a position information detection unit detecting position information related to a position of a mining machine; and a determination unit determining a second route corresponding to a plurality of pieces of the position information is identical to a first route based on at least whether a position of each node corresponds with the position information, the node being a piece of information related to a position of the first route that is a route taken by the mining machine departing a predetermined first position, passing a second position at which a load is loaded, and moving to a third position at which the load is removed.