ML Maintenance Scheduling for Asset-Specific Service Timing

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Current maintenance scheduling for industrial assets is often inaccurate and resource-intensive, as existing methods are agnostic to individual asset operations and do not account for actual performance data, leading to inefficient maintenance that may not improve asset performance significantly.

Innovation Solution

A computer-implemented method using an intelligence machine learning model that generates a dynamic maintenance schedule based on alert history, maintenance standards, service history, and user-specific data, including metadata, to determine optimal maintenance times and actions, while providing narratives for adjustments and automatically flagging untrustworthy performance metrics and toggling alert generation rules.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If traditional scheduled maintenance is performed at fixed intervals, then maintenance can be performed systematically, but resources are wasted on unnecessary maintenance and asset performance may not be significantly improved

Engineering Contradiction:
Improveasset performanceVSAvoidresource expenditure
Core Design Contradiction:
ReliabilityVSLoss of energy

Solution Approach 1:

The maintenance schedule transitions from static fixed intervals to dynamic scheduling based on real-time asset condition data. The system continuously monitors asset health metrics and adjusts maintenance timing dynamically, performing maintenance only when actually needed rather than at predetermined intervals, thereby optimizing both reliability and resource utilization.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The asset effectively monitors its own condition through integrated sensors and data collection systems, providing self-diagnostic information about its health status. This enables the system to determine when maintenance is actually required without external intervention or predetermined scheduling, allowing maintenance to be performed only when the asset itself indicates a need.

Inventive Principle:
Principle #25Self-service

2Reliability

If maintenance is performed at scheduled times regardless of asset condition, then maintenance planning is simplified, but maintenance accuracy and effectiveness are reduced

Engineering Contradiction:
Improvemaintenance effectivenessVSAvoidscheduling system complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The traditional mechanical scheduling approach based on fixed time intervals is replaced with an intelligent data-driven system. The system uses machine learning models, predictive analytics, and real-time data processing to determine maintenance timing, substituting simple calendar-based scheduling with sophisticated algorithms that analyze asset condition data to predict when maintenance will be effective.

Inventive Principle:
Principle #28Mechanics substitution (Replace mechanical system)

Solution Approach 2:

The system implements continuous feedback loops where asset performance data, maintenance outcomes, and condition monitoring information are constantly fed back into the scheduling algorithm. This feedback mechanism allows the system to learn from past maintenance effectiveness and adjust future scheduling decisions, improving maintenance accuracy while the automated nature of the feedback process manages system complexity.

Inventive Principle:
Principle #23Feedback

3Measurement precision

If fixed interval maintenance scheduling is used, then resource allocation is predictable, but maintenance precision and asset-specific needs are not addressed

Engineering Contradiction:
Improvemaintenance timing accuracyVSAvoidplanning and execution time
Core Design Contradiction:
Measurement precisionVSLoss of time

Solution Approach 1:

The system performs preliminary analysis of asset condition data, historical maintenance records, and predictive modeling in advance to identify optimal maintenance timing before it becomes critical. By proactively analyzing data trends and predicting future asset states, the system determines precise maintenance windows ahead of time, improving timing accuracy while the automated preliminary actions reduce the need for reactive planning.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20240402699A1Apparatuses, computer-implemented methods, and computer program products for improved maintenance identification and scheduling
Publication Date: 2024.12.05 HONEYWELL INTERNATIONAL INC
  • US20240402699A1 patent drawing
  • US20240402699A1 patent drawing
  • US20240402699A1 patent drawing

AI summary

Embodiments provide improved determinations of maintenance to be performed for asset(s), and scheduling of such maintenance to initiate for the asset(s), for example in an industrial control system. Some embodiments receive particular input data including (i) alert history data corresponding to an asset, (ii) maintenance standards data corresponding to the asset, (iii) service history data corresponding to the asset, and (iv) user-specific data corresponding to the asset, apply the input data to an intelligence machine learning model that generates a maintenance schedule based at least in part on the input data, and outputs a particular maintenance schedule corresponding to the asset via output from the intelligence machine learning model based at least in part on the input data.