Problem

Delays in commissioning semiconductor processing tools occur due to the unavailability of site facilities like power, compressed air, and vacuum during construction or expansion of a semiconductor processing site, preventing the tools from being used for production.

Innovation Solution

A self-contained mobile facilities cart provides essential facilities such as electrical power, compressed air, and vacuum to semiconductor processing tools, allowing commissioning to take place independently of site connections through battery packs, compressors, and vacuum pumps.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Speed

If semiconductor processing tools are delivered to a site before facilities are available, then tool delivery time is improved, but commissioning cannot proceed causing delays

Engineering Contradiction:
Improvetool delivery speedVSAvoidcommissioning delay
Core Design Contradiction:
SpeedVSLoss of time

Solution Approach 1:

The mobile facilities cart is prepared and configured with all necessary facilities (power, compressed air, vacuum) before the semiconductor processing tool is delivered to the site. This preliminary preparation allows the tool to be immediately connected and commissioned upon arrival, eliminating waiting time for facility installation while maintaining the ability to deliver tools early.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The mobile facilities cart serves as an intermediary between the semiconductor processing tool and the permanent site facilities. It provides temporary facilities that enable tool operation and commissioning before the permanent facilities are ready, acting as a bridge that resolves the timing mismatch between tool delivery and facility availability.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Reliability

If permanent facility connections are required before tool commissioning, then facility reliability is improved, but commissioning timeline is extended

Engineering Contradiction:
Improvefacility connection reliabilityVSAvoidcommissioning timeline
Core Design Contradiction:
ReliabilityVSLoss of time

Solution Approach 1:

The mobile facilities cart is configured with reliable temporary connections that meet the operational requirements for tool commissioning. These preliminary connections include properly rated electrical outlets, compressed air regulators, and vacuum pump connections that provide sufficient reliability for testing and calibration activities before permanent facilities are operational.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The mobile facilities cart provides more than minimal facilities by including redundant power sources, multiple compressed air outlets, and comprehensive vacuum capabilities. This excessive provision of facilities ensures that all commissioning requirements can be met simultaneously without needing to wait for permanent facility completion, thereby compressing the commissioning timeline while maintaining adequate reliability.

Inventive Principle:
Principle #16Partial or excessive action

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

Enables timely commissioning and qualification of semiconductor processing tools by providing necessary facilities on-site, reducing delays and allowing tools to be operational even before all site facilities are available.

Implementation Method 1

at least one battery pack configured to supply electrical power to the semiconductor processing tool via a power port

Methodology Applied
Scientific EffectBattery (electricity): Battery (electricity)

Implementation Method 2

a compressor powered by the at least one battery pack, the compressor configured to supply compressed air to the semiconductor processing tool via a compressed air port

Methodology Applied
Scientific EffectCompression: Compression

Implementation Method 3

a vacuum pump powered by the at least one battery pack, the vacuum pump configured to supply vacuum to the semiconductor processing tool via a vacuum port

Methodology Applied
Scientific EffectVacuum: Vacuum

Data Source

PatentUS20240404848A1Mobile Cart for Commissioning Semiconductor Processing Tool
Publication Date: 2024.12.05 APPLIED MATERIALS INC
  • US20240404848A1 patent drawing
  • US20240404848A1 patent drawing
  • US20240404848A1 patent drawing

AI summary

Methods and apparatus for commissioning a semiconductor processing tool include connecting a mobile facilities cart to a semiconductor processing tool; supplying facilities from the mobile facilities cart to the semiconductor processing tool; and operating the semiconductor processing tool using facilities supplied by the connected mobile facilities cart.