Building unit and building

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

In constructing multi-story buildings using pre-assembled building units, it is challenging to install common equipment, such as air conditioning ducts and electrical wires, across both upper and lower floors effectively, leading to variations in quality and increased costs.

Innovation Solution

The building unit is designed with pre-assembled first and second units that include pre-installed equipment, allowing for the stacking and connection of these units on-site, with vertical air circulation ducts and electrical infrastructure that can be easily linked to ensure uniform temperature distribution and reduced energy consumption across floors.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If building units are divided into multiple units and stacked at the building site, then transportation and assembly become feasible, but installation of common equipment across units becomes difficult

Engineering Contradiction:
Improveassembly efficiencyVSAvoidequipment installation
Core Design Contradiction:
ProductivityVSEase of manufacture

Solution Approach 1:

The patent applies preliminary action by pre-installing equipment within individual building units before they are transported to the building site. The equipment is installed in advance in each unit, and then the units are simply connected together at the site, eliminating the difficulty of installing common equipment across multiple stacked units.

Inventive Principle:
Principle #10Preliminary action

2Adaptability or versatility

If equipment is installed at the building site using traditional construction methods, then flexibility is maintained, but quality variation and cost increase

Engineering Contradiction:
Improveconstruction flexibilityVSAvoidquality consistency
Core Design Contradiction:
Adaptability or versatilityVSManufacturing precision

Solution Approach 1:

The patent applies segmentation by dividing the building into separate pre-fabricated units, each equipped with necessary equipment. This allows equipment to be installed in a controlled factory environment for each unit, ensuring quality consistency, while the modular nature maintains construction flexibility through standardized connections.

Inventive Principle:
Principle #1Segmentation

3Productivity

If multiple units are stacked to form multi-story buildings, then construction speed increases, but uniform equipment distribution across floors becomes challenging

Engineering Contradiction:
Improveconstruction speedVSAvoidequipment distribution
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The patent applies universality by designing each building unit with standardized equipment installation capabilities and interfaces. This allows the same equipment types to be uniformly distributed across multiple stacked units, simplifying the equipment distribution system while maintaining fast construction speed through modular assembly.

Inventive Principle:
Principle #6Universality (Multi-functionality)

Data Source

PatentUS10563394B2Building unit and building
Publication Date: 2020.02.18 PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
  • US10563394B2 patent drawing
  • US10563394B2 patent drawing
  • US10563394B2 patent drawing

AI summary

A building unit constitutes part of a two or more story building. The building unit includes: a first unit that is pre-assembled somewhere other than at a building site and constitutes one of a plurality of floors; a second unit that is pre-assembled somewhere other than at the building site and constitutes a floor above the first unit out of the plurality of floors; and a space path (upper and lower floor air circulation duct that spatially communicates with the first unit and the second unit.