Problem

Construction projects, especially in sensitive areas like dark sky reserves, are hindered by external environmental factors and require extensive impact assessments, leading to inefficiencies and high costs due to weather interruptions and light pollution, necessitating a solution to create a controlled construction environment.

Innovation Solution

A modular assembly comprising portal frames, rails, and flexible panels that enclose the construction site, allowing continuous work and reduced environmental impact by controlling weather and light conditions.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If conventional construction is carried out in open environment, then construction can be performed with simple setup, but productivity is reduced due to weather interruptions and environmental factors

Engineering Contradiction:
Improveconstruction productivityVSAvoidenvironmental impact
Core Design Contradiction:
ProductivityVSObject-affected harmful factors

Solution Approach 1:

The patent employs flexible fabric panels as the enclosure material for the modular assembly. These flexible shells create a controlled environment that protects construction activities from weather interruptions while allowing rapid deployment and adaptation to different site configurations, thereby resolving the contradiction between productivity and environmental protection.

Inventive Principle:
Principle #30Flexible shells and thin films

Solution Approach 2:

The construction enclosure is divided into modular panels and frames that can be assembled in segments. This segmentation allows the structure to be configured to specific site requirements while maintaining environmental protection benefits, enabling high productivity without compromising protection from harmful environmental factors.

Inventive Principle:
Principle #1Segmentation

2Productivity

If modular assembly is constructed to enclose site, then environmental impact is reduced and productivity improved, but device complexity increases

Engineering Contradiction:
Improveconstruction continuityVSAvoidmodular assembly complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The modular assembly is divided into standardized panels and frames that can be independently manufactured and assembled. This segmentation reduces on-site construction complexity while maintaining the ability to create enclosed spaces that ensure continuous productivity, as components can be pre-fabricated and quickly assembled.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The modular panels and frames are designed with universal connection mechanisms that can be used across different assembly configurations. This universality reduces the complexity of the overall system by using standardized components rather than custom-designed elements, while still enabling continuous construction operations.

Inventive Principle:
Principle #6Universality (Multi-functionality)

3Loss of time

If pre-assembled units are used for portal frames, then assembly time is reduced, but manufacturing complexity increases

Engineering Contradiction:
Improveassembly timeVSAvoidmanufacturing complexity
Core Design Contradiction:
Loss of timeVSEase of manufacture

Solution Approach 1:

The portal frames are constructed from pre-assembled units that segment the manufacturing process. This allows frames to be manufactured off-site with controlled complexity and then quickly assembled on-site, reducing overall assembly time while managing manufacturing complexity through standardized production processes.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

Portal frame units are pre-assembled and prepared before being transported to the construction site. This preliminary action reduces on-site assembly time and complexity by having components ready in a pre-configured state, allowing rapid deployment of the modular enclosure structure.

Inventive Principle:
Principle #10Preliminary action

Data Source

PatentUS20250290335A1Modular structure for providing on-site protection
Publication Date: 2025.09.18 BAM NUTTALL LTD
  • US20250290335A1 patent drawing
  • US20250290335A1 patent drawing
  • US20250290335A1 patent drawing

AI summary

The present disclosure relates to a modular assembly, a site factory, for at least partially enclosing a site during construction of a structure. The modular assembly comprising: a plurality of portal frames, each portal frame comprising two columns and a roof beam, each column and roof beam comprising a plurality of pre-assembled units; a jack-up frame for each column; at least two first rails, each of the first rails being mounted to at least one of the roof beams; at least one second rail slidably mounted to the at least two first rails; and a plurality of panels of a flexible material configured to provide a full enclosure of the site and mounted above the roof beam. The or each second rail is configured to slidably receive at least one lifting device. The pre-assembled units are configured to be connected on site, and lifted using said jack-up frames, to form the portal frames, and wherein each first rail, and the or each second rail are configured to be mounted on the portal frames on site.