Problem

Traditional HVAC duct systems require complex on-site fabrication and multiple trades to install fire-rated shafts with subducts, leading to time-consuming and costly processes.

Innovation Solution

A prefabricated, modular, all-in-one fire-rated ventilation shaft duct assembly with integral subducts, featuring horizontal and vertical ducts made from various materials, which can be easily assembled and connected, eliminating the need for on-site fabrication.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If traditional field-fabricated duct systems are used, then installation flexibility is maintained, but installation time and labor costs increase significantly

Engineering Contradiction:
Improveinstallation speedVSAvoidfabrication complexity
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The duct assembly is pre-fabricated off-site with all necessary components (main duct, subducts, fire dampers, insulation, vapor barriers) assembled before delivery to the installation site. This preliminary fabrication eliminates time-consuming on-site construction while maintaining design flexibility through modular configurations.

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

Multiple separate components (main duct, subducts, fire dampers, insulation layers, vapor barriers) are merged into a single integrated prefabricated assembly. This consolidation reduces the number of separate installation steps and trades required, directly improving installation productivity.

Inventive Principle:
Principle #5Merging (Combining)

2Loss of time

If multiple separate components are used for main duct and subducts, then installation flexibility is maintained, but installation time increases

Engineering Contradiction:
Improveinstallation timeVSAvoidassembly ease
Core Design Contradiction:
Loss of timeVSEase of manufacture

Solution Approach 1:

The main duct and subducts are manufactured as a single integrated assembly with all connections, fire dampers, and insulation pre-installed. This merging eliminates the need for multiple separate installation steps, significantly reducing on-site installation time while maintaining ease of manufacture through standardized modular designs.

Inventive Principle:
Principle #5Merging (Combining)

Solution Approach 2:

All assembly operations (welding, insulation installation, vapor barrier application, fire damper installation) are performed in advance during manufacturing. This preliminary action transfers complexity to the manufacturing phase where it can be efficiently handled, leaving only simple installation tasks for the construction site.

Inventive Principle:
Principle #10Preliminary action

3Device complexity

If fire-rated shafts with subducts are fabricated on-site, then fire resistance ratings are maintained, but multiple trades and extensive fabrication are required

Engineering Contradiction:
Improvenumber of trades requiredVSAvoidfire resistance rating
Core Design Contradiction:
Device complexityVSReliability

Solution Approach 1:

All components requiring fire-rated construction (main duct, subducts, fire dampers, insulation, vapor barriers) are merged into a single pre-assembled fire-rated unit. This eliminates the need for multiple specialized trades (metalworkers, HVAC technicians, carpenters) to perform separate fabrication steps on-site, reducing device complexity while maintaining fire resistance through factory-controlled quality assurance.

Inventive Principle:
Principle #5Merging (Combining)

Data Source

PatentUS9441852B2Prefabricated, modular, fire resistance and non-fire resistance rated ventilation duct assembly with integral subducts
Publication Date: 2016.09.13 CARDINAL IP HOLDING LLC
  • US9441852B2 patent drawing
  • US9441852B2 patent drawing
  • US9441852B2 patent drawing

AI summary

A prefabricated, modular, duct assembly comprising a main duct having an outer wall, an inner wall, a first end and a second end. A horizontal duct assembly extending through the main duct between the first end and the second end. A vertical duct assembly extending along the inner wall from the horizontal duct assembly to the first end.