Problem
Traditional monopole tower foundations are expensive to construct, immovable, and lack the ability to raise and lower the monopole and attached equipment, making them inefficient for changing locations and vulnerable to weather damage.
Innovation Solution
A portable and modular foundation system with a central hub and legs that can be assembled on-site, featuring removable floor and wall panels for ballast support, and a lifting mechanism to raise and lower the monopole and attached equipment, allowing for both above-ground and buried installation.
Engineering Contradictions & Design Principles
Engineering Contradiction Analysis
1Stability of the object's composition
If traditional concrete foundations are used, then the monopole tower is securely supported, but the foundation becomes immovable and expensive to construct
Solution Approach 1:
The foundation is divided into multiple discrete components including a central hub, multiple legs, and removable wall panels that can be assembled and disassembled independently. This segmentation enables the foundation to be transported in compact form and reassembled at different locations while maintaining structural stability when assembled.
Solution Approach 2:
The foundation transitions from a static concrete structure to a dynamic modular system that can be assembled, disassembled, and reconfigured. The removable wall panels and adjustable leg configurations allow the foundation to adapt to different locations and operational requirements while maintaining stability through proper assembly.
2Reliability
If the monopole is fixed in elevated position, then equipment is protected from ground-level damage, but the equipment becomes vulnerable to weather-related damage and cannot be accessed for maintenance
Solution Approach 1:
The monopole tower is integrated with the modular foundation to create a movable system that can be raised to elevated positions for protection and lowered to ground level for maintenance and repair. This dynamic capability allows the system to switch between protection mode and maintenance mode as needed.
3Strength
If concrete foundations are constructed, then the monopole is securely anchored, but the construction cost increases and construction permits are required
Solution Approach 1:
The foundation system uses pre-fabricated modular components that can be assembled on-site without extensive concrete construction. The central hub and legs are designed as discrete units that can be connected using simple fastening mechanisms, eliminating the need for expensive concrete pouring and curing processes.
Solution Approach 2:
The modular foundation components are designed to be cost-effective alternatives to permanent concrete foundations. The system can be assembled and disassembled multiple times, providing an economical solution for temporary or relocatable monopole installations without requiring expensive concrete construction.
Data Source
AI summary
A portable and modular foundation that can be utilized to support a monopole includes a central hub and a plurality of legs. A proximal end of each leg is removably attached to the central hub. A plurality of floor panels extends from proximate the hub to a perimeter of the foundation and define a substantially uninterrupted floor. With the plurality of floor panels attached to the legs, the foundation can optionally be buried where the soil or other material is positioned on top of the floor panels to provide the necessary ballast to allow the foundation to retain a monopole with a piece of equipment in an elevated position. Alternatively, if the foundation is to be utilized above ground, a plurality of wall panels can be attached to the floor panels and the legs with braces to retain the wall panels in a substantially vertical position. The plurality of wall panels forms a substantially continuous wall about a perimeter of foundation such that ballast can be placed therein.