Problem

Prefabricated building frames are difficult to transport and handle, especially in restricted access construction sites, leading to increased construction costs due to their large size.

Innovation Solution

A modular perimeter frame system comprising a first modular sub-frame with a blunt end portion and a second modular sub-frame with an overhang end portion, designed for continuous abutting engagement, along with ladder and top hat sub-frames that can be preassembled and easily interconnected to form perimeter frames for floors, walls, and roofs.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If preassembled building frames are used, then construction efficiency is improved, but transportability and handling ease deteriorate due to large size

Engineering Contradiction:
Improveconstruction efficiencyVSAvoidtransportability and handling
Core Design Contradiction:
ProductivityVSEase of operation

Solution Approach 1:

The building frame is divided into multiple modular sub-frames that can be transported separately and assembled on-site. Each sub-frame is a manageable size for transport while the complete assembly provides the structural integrity of a full preassembled frame, resolving the contradiction between construction efficiency and transportability.

Inventive Principle:
Principle #1Segmentation

2Productivity

If preassembled building frames are used, then construction speed is improved, but accessibility to restricted sites deteriorates

Engineering Contradiction:
Improveconstruction speedVSAvoidsite accessibility
Core Design Contradiction:
ProductivityVSEase of operation

Solution Approach 1:

By segmenting the frame into smaller modular sub-frames, the system enables access to restricted construction sites that cannot accommodate large preassembled frames, while maintaining construction speed through efficient on-site assembly of the modular components.

Inventive Principle:
Principle #1Segmentation

3Ease of operation

If modular sub-frames with blunt and overhang end portions are used, then assembly ease is improved, but manufacturing complexity increases

Engineering Contradiction:
Improveassembly easeVSAvoidmanufacturing complexity
Core Design Contradiction:
Ease of operationVSEase of manufacture

Solution Approach 1:

The sub-frames employ asymmetric end portions (blunt and overhang) that provide intuitive alignment and connection during assembly. The blunt end of one sub-frame fits with the overhang end of another, creating an obvious assembly sequence that improves ease of operation despite requiring precise manufacturing of the asymmetric features.

Inventive Principle:
Principle #4Asymmetry

Data Source

PatentUS11566412B2Building construction
Publication Date: 2023.01.31 J & S JOYCE PTY LTD
  • US11566412B2 patent drawing
  • US11566412B2 patent drawing
  • US11566412B2 patent drawing

AI summary

A modular perimeter frame system is described for forming a perimeter frame used in the construction of floors, walls and roofs of buildings. The modular perimeter frame system has a first modular sub-frame having one or two blunt end portions, and a second modular sub-frame having one or two overhang end portions. The blunt and overhang end portions are so dimensioned and shaped as to facilitate a continuous abutting engagement between at least two surfaces which meet at a corner of the blunt end portion and at least two surfaces which meet at a corner of the overhang end portion.