Modular Rebar Support with Interlocking Cradles

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

The manual installation of steel reinforcement in high-rise buildings is labor-intensive, prone to human error, and requires multiple workers, leading to inefficiencies and potential inaccuracies in arranging and tying rebar for reinforced concrete structures.

Innovation Solution

A rebar support apparatus with elongate bodies featuring cradles for holding transverse and longitudinal rebars, allowing for accurate placement and alignment without the need for manual tying, using non-ferrous materials that are unreactive with concrete, and enabling easy assembly and spacing for efficient concrete pouring.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Productivity

If manual tying of transverse rebar to longitudinal steel reinforcement members is used, then the rebar can be arranged and tied, but the process requires many worker-hours and is labor-intensive

Engineering Contradiction:
Improveinstallation speedVSAvoidlabor requirement
Core Design Contradiction:
ProductivityVSDevice complexity

Solution Approach 1:

The rebar support system is designed to be self-positioning and self-aligning through its elongate body with multiple cradles that automatically guide transverse rebars into correct positions without requiring manual measurement or adjustment by workers

Inventive Principle:
Principle #25Self-service

Solution Approach 2:

The rebar support acts as an intermediary device between the longitudinal steel reinforcement members and transverse rebars, providing a structured framework that facilitates their connection without requiring direct manual manipulation of each tie

Inventive Principle:
Principle #24Intermediary (Mediator)

2Manufacturing precision

If manual marking and placement of rebar is performed, then positioning can be achieved, but human error may cause inaccurate rebar layout and weak ties

Engineering Contradiction:
Improverebar placement accuracyVSAvoidconsistency of ties
Core Design Contradiction:
Manufacturing precisionVSReliability

Solution Approach 1:

The elongate body with pre-positioned cradles performs the preliminary action of defining exact rebar locations before the actual installation, eliminating the need for manual marking and ensuring consistent, accurate placement throughout the structure

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The rebar support system creates a standardized template or copy of the ideal rebar arrangement, which can be replicated across multiple locations, ensuring uniformity and accuracy without relying on individual worker skill or attention

Inventive Principle:
Principle #26Copying

3Ease of operation

If multiple steel fixers are deployed to handle the arduous work of tying rebar above head level, then the task can be completed, but the cost and time requirements increase significantly

Engineering Contradiction:
Improveworker comfortVSAvoidinstallation time
Core Design Contradiction:
Ease of operationVSLoss of time

Solution Approach 1:

The rebar support system transitions the installation process from a vertical, overhead operation to a more accessible, structured assembly process where components can be positioned and connected at convenient heights using the modular elongate body sections

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

Data Source

PatentUS10914072B2Apparatus for arranging steel reinforcement prior to a concrete pour
Publication Date: 2021.02.09 JALT TECH PTY LTD
  • US10914072B2 patent drawing
  • US10914072B2 patent drawing
  • US10914072B2 patent drawing

AI summary

A rebar support comprising: an elongate body have a first plurality of rebar cradles disposed along its length for holding rebars in a first direction; a plurality of chairs located along a back of the elongate body, each of the chairs including at least one cradle for holding steel reinforcement members in a second direction at right angles to the first direction; and first and second complementary engagement formations located at opposed ends of the elongate body for facilitating end-to-end fastening of two or more rebar supports.