Modular Scaffolding with Gravity-Attach Outriggers

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Traditional scaffolding structures are prone to instability due to independent ground support, which can be compromised by changing ground conditions, and there is a need for efficient and versatile worker access in multi-level pipeline support systems for fluid energy facilities.

Innovation Solution

A modular, quick-attachable and removable lateral scaffolding system that uses outrigger support connected to a pipe-support frame, featuring uniformly spaced columns and selectively graduated gravity catch structures for attaching modular scaffolding units, allowing for flexible and stable worker access at various elevations.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Ease of operation

If traditional scaffolding structures use independent ground support, then installation is straightforward on stable ground, but stability is compromised when ground conditions change

Engineering Contradiction:
Improveinstallation simplicityVSAvoidscaffolding stability
Core Design Contradiction:
Ease of operationVSReliability

Solution Approach 1:

The patent introduces an outrigger structure as an intermediary element that connects the scaffolding to the building frame rather than relying on ground support. The outrigger acts as a mediator that transfers loads from the scaffolding to the stable building structure, eliminating the harmful dependency on variable ground conditions while maintaining installation feasibility through standardized connection mechanisms

Inventive Principle:
Principle #24Intermediary (Mediator)

2Productivity

If modular scaffolding units are made quickly attachable and removable, then installation and dismantling speed increases, but connection reliability may be compromised

Engineering Contradiction:
Improveinstallation speedVSAvoidconnection stability
Core Design Contradiction:
ProductivityVSReliability

Solution Approach 1:

The scaffolding system is divided into modular units with standardized connection interfaces. Each module can be independently assembled and attached to the outrigger structure using quick-connect mechanisms, enabling rapid deployment while maintaining structural integrity through standardized connection points that ensure reliable load transfer

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The connection system utilizes gravity-attached mechanisms where the attachment state changes from unattached to attached through a simple gravity-driven engagement process. This parameter change approach allows workers to quickly secure modules by simply lowering them into place where gravity ensures proper engagement, significantly speeding up installation while maintaining connection reliability

Inventive Principle:
Principle #35Parameter changes

3Reliability

If scaffolding is designed as outrigger structure attached to frame, then stability is improved by avoiding ground contact, but device complexity increases

Engineering Contradiction:
Improvescaffolding stabilityVSAvoidsupport structure complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The outrigger structure serves multiple functions: it provides lateral support for the scaffolding, connects modular units to the building frame, and eliminates the need for separate ground support systems. This multi-functionality reduces overall system complexity despite the elevated attachment mechanism, as it consolidates several structural requirements into a single integrated component

Inventive Principle:
Principle #6Universality (Multi-functionality)

4Adaptability or versatility

If modular scaffolding units are selectively attachable at various elevations, then versatility and adaptability increase, but system complexity increases

Engineering Contradiction:
Improveelevation flexibilityVSAvoidattachment system complexity
Core Design Contradiction:
Adaptability or versatilityVSDevice complexity

Solution Approach 1:

The outrigger structure incorporates vertically distributed attachment points with locally optimized connection mechanisms at each elevation level. Each attachment point is designed with the specific qualities needed for its location, allowing modular scaffolding units to be secured at various heights while maintaining a relatively simple overall system through standardized local connection solutions

Inventive Principle:
Principle #3Local quality

Data Source

PatentUS9803380B2Plural-story, pipe-support frame system with modular, removably attachable lateral-worker-support scaffolding
Publication Date: 2017.10.31 CONXTECH INC
  • US9803380B2 patent drawing
  • US9803380B2 patent drawing
  • US9803380B2 patent drawing

AI summary

A pipe-support system including a pipe-support frame structure having plural, substantially horizontal, pipe-support levels supported by columns including a distribution of side columns uniformly spaced along at least one side of the frame structure, and featuring selectively graduated, support-level-indifferent, lateral-connectivity access for quickly available, removeable, outrigger gravity attachment to the frame's side columns, through gravity catch and hook structures, of modular, outrigger, lateral, worker-platform scaffolding either as individual scaffolding units, or as assemblies of plural, individual units, all such units deriving vertical support through outrigger connections made to the frame structure.