Mounting Delay Analysis Screens for Preparation Time Deviations

Resolve Bottlenecks,
Find Innovative Solutions
Generate Solutions

Solution Overview

Problem

Existing analysis methods fail to accurately identify the cause of delays in the mounting step of a circuit board production process, as indicated by a time chart, which does not account for actual time deviations from scheduled times.

Innovation Solution

An analysis support device and system that includes a display control section to show first and second screens displaying device and preparation actual vs. scheduled times, allowing users to analyze delays through graphical and tabular representations, and optionally showing device abnormalities.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Loss of information

If a time chart is displayed to show the state of the mounting step, then the user can view the scheduled time and actual result time, but the user cannot analyze the cause of the delay

Engineering Contradiction:
Improvecause analysis informationVSAvoiddisplay system complexity
Core Design Contradiction:
Loss of informationVSDevice complexity

Solution Approach 1:

The display system is segmented into multiple screens: a first screen showing the time chart with scheduled and actual times, and a second screen showing detailed preparation step information. This segmentation allows the user to access cause analysis information without overwhelming the interface with all data at once, resolving the contradiction between providing comprehensive information and maintaining simple device complexity.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The system transitions from a two-dimensional time chart view to a multi-dimensional analysis by adding a second screen dimension that displays preparation step details. This dimensional expansion enables cause analysis by showing the relationship between preparation steps and mounting step delays, thereby recovering lost information without significantly increasing device complexity.

Inventive Principle:
Principle #17Another dimension (Dimensionality change)

2Loss of information

If detailed preparation step information is always displayed, then the user can identify delay causes, but the interface becomes complex and difficult to operate

Engineering Contradiction:
Improvedelay cause informationVSAvoidinterface usability
Core Design Contradiction:
Loss of informationVSEase of operation

Solution Approach 1:

The display system dynamically switches between different screens based on user needs. The first screen provides a simple time chart overview, while the second screen provides detailed preparation step information. This dynamic switching maintains ease of operation by showing only relevant information at each moment, while still providing access to complete delay cause information when needed.

Inventive Principle:
Principle #15Dynamics

Solution Approach 2:

The system prepares detailed preparation step information in advance but keeps it hidden until the user needs it. By pre-processing and organizing the data, the system can quickly display detailed information on the second screen when requested, maintaining ease of operation while ensuring delay cause information is readily available when needed.

Inventive Principle:
Principle #10Preliminary action

3Measurement precision

If only the mounting step time is monitored, then the interface remains simple, but the cause of delay cannot be identified

Engineering Contradiction:
Improvedelay analysis precisionVSAvoidmonitoring system complexity
Core Design Contradiction:
Measurement precisionVSDevice complexity

Solution Approach 1:

The preparation step information acts as an intermediary between the simple time chart display and the detailed cause analysis. By introducing this intermediate layer that shows preparation step timing and status, the system enables precise delay cause identification without directly complicating the main monitoring interface, thus improving measurement precision while controlling device complexity.

Inventive Principle:
Principle #24Intermediary (Mediator)

Data Source

PatentUS12475618B2Analysis support device and analysis support system
Publication Date: 2025.11.18 FUJI CORP
  • US12475618B2 patent drawing
  • US12475618B2 patent drawing
  • US12475618B2 patent drawing

AI summary

An analysis support device includes a display; a first display control section configured to display a first screen including a device scheduled image and a device actual result image on the display when a device actual result time at which a mounting device actually performs a mounting step of mounting a component on a substrate is delayed; and a second display control section configured to display a second screen including a preparation scheduled image and a preparation actual result image on the display when a predetermined first instruction is given by a user after the first screen is displayed on the display, the preparation scheduled image indicating a preparation scheduled time at which a preparation step, which is preparation for the mounting step, is to be performed, and the preparation actual result image indicating a preparation actual result time at which the preparation step is actually performed.