Problem

In conventional mounting devices, the timing of notifying inspection results to operators is not considered, leading to inefficiencies in production as operators must handle each defective component individually, which hampers production efficiency and requires careful timing for mounting processes.

Innovation Solution

A mounting device with a control section that acquires inspection results and notifies operators of defectiveness before proceeding with the mounting process, allowing for collective handling of multiple defective components, thereby improving operator efficiency and reducing production downtime.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If inspection results are notified immediately after each inspection, then the operator can handle defective components promptly, but the operator must deal with each defective component individually, reducing production efficiency

Engineering Contradiction:
Improvedefective component handling timelinessVSAvoidproduction efficiency
Core Design Contradiction:
ReliabilityVSProductivity

Solution Approach 1:

The control section accumulates inspection results and notifies the operator in advance before the mounting process begins. This preliminary notification allows the operator to prepare for handling multiple defective components together, rather than dealing with each one individually as it is detected, thus improving production efficiency while maintaining reliable defective component handling

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

Multiple inspection results are merged into a single collective notification to the operator. Instead of notifying the operator separately for each defective component, the system combines multiple inspection outcomes and presents them together, enabling the operator to handle multiple defective components in one operation and improving overall productivity

Inventive Principle:
Principle #5Merging (Combining)

2Manufacturing precision

If the mounting process waits for inspection results to be determined, then mounting accuracy is improved, but production efficiency deteriorates due to sequential processing

Engineering Contradiction:
Improvemounting accuracyVSAvoidproduction efficiency
Core Design Contradiction:
Manufacturing precisionVSProductivity

Solution Approach 1:

Inspection processes are performed in advance on components before the mounting process begins. The control section accumulates inspection results and makes them available before mounting decisions need to be made, allowing the mounting process to proceed with accurate information without waiting sequentially for each inspection to complete, thus improving both mounting accuracy and production efficiency

Inventive Principle:
Principle #10Preliminary action

Solution Approach 2:

The system dynamically manages the timing and flow of inspection and mounting processes. By allowing inspection and mounting to proceed in parallel where possible, and by dynamically adjusting the notification timing to coincide with mounting preparation, the system optimizes both the accuracy of mounting decisions and the overall production throughput

Inventive Principle:
Principle #15Dynamics

Data Source

PatentUS12160958B2Mounting device and method for controlling mounting device
Publication Date: 2024.12.03 FUJI CORP
  • US12160958B2 patent drawing
  • US12160958B2 patent drawing
  • US12160958B2 patent drawing

AI summary

A mounting device includes a mounting section configured to pick up a component from a supply section that holds the component and execute a mounting process of the component on a mounting target, and a control section configured to acquire an inspection result obtained by executing an inspection process on the components placed on the mounting target and to notify an operator of the inspection result indicating that the component is defective at a timing before mounting an inspection resulted mounting component that is turned out to be mountable after the inspection result is determined.