Problem

Conventional mud pulse telemetry systems for measurement-while-drilling (MWD) operations are costly and complex due to the need for intricate pressure port designs and extensive disassembly for maintenance, limiting the length and efficiency of data transmission in drilling operations.

Innovation Solution

A mud pulse telemetry valve assembly with a flow restriction member, control valve assembly, and pilot valve assembly that utilizes hydrostatic pressure to reduce energy requirements for data transmission, featuring a larger diameter screen assembly to enhance surface area and reduce pressure drop, and a modular design for easier maintenance.

Engineering Contradictions & Design Principles

VSEngineering Contradiction Analysis

1Reliability

If conventional mud pulse telemetry systems use intricate pressure port designs, then data transmission capability is achieved, but device complexity and maintenance difficulty increase

Engineering Contradiction:
Improvedata transmission capabilityVSAvoidpressure port design complexity
Core Design Contradiction:
ReliabilityVSDevice complexity

Solution Approach 1:

The valve assembly is divided into modular components including a valve body, screen assembly, control valve, and pilot valve that can be independently manufactured, assembled, and maintained. This segmentation reduces overall system complexity while maintaining data transmission functionality.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

A screen assembly with increased surface area is introduced as an intermediary component between the mud pulse source and the valve mechanism. This screen enhances pressure regulation capability while simplifying the overall pressure port design and reducing complexity.

Inventive Principle:
Principle #24Intermediary (Mediator)

2Productivity

If conventional screen assemblies use smaller diameter designs, then device size is reduced, but pressure drop increases and efficiency decreases

Engineering Contradiction:
Improvemud pulse telemetry efficiencyVSAvoidpressure drop
Core Design Contradiction:
ProductivityVSLoss of energy

Solution Approach 1:

The screen assembly is designed with an increased diameter and optimized opening area, changing the geometric parameters to reduce flow resistance. This increases the screen surface area by a significant margin, thereby reducing pressure drop and improving mud pulse telemetry efficiency.

Inventive Principle:
Principle #35Parameter changes

3Ease of repair

If extensive disassembly is required for maintenance, then component access is achieved, but maintenance time and operational downtime increase

Engineering Contradiction:
Improvecomponent accessibilityVSAvoidmaintenance downtime
Core Design Contradiction:
Ease of repairVSLoss of time

Solution Approach 1:

The valve assembly is designed as a modular unit with clearly defined components (valve body, screen assembly, control valve, pilot valve) that can be independently accessed and maintained. This segmentation allows for rapid component replacement without extensive disassembly, reducing maintenance downtime.

Inventive Principle:
Principle #1Segmentation

Solution Approach 2:

The modular design allows critical components to be pre-assembled and tested as complete units before installation. This preliminary preparation enables quick swap-out during maintenance operations, minimizing operational downtime.

Inventive Principle:
Principle #10Preliminary action

4Reliability

If high energy is used for data transmission, then signal strength is improved, but energy consumption increases operational cost

Engineering Contradiction:
Improvesignal transmission qualityVSAvoidenergy for data transmission
Core Design Contradiction:
ReliabilityVSUse of energy by moving object

Solution Approach 1:

The system utilizes hydraulic principles by optimizing the screen assembly and pressure port design to efficiently convert mud flow into pressure pulses for data transmission. This hydraulic approach reduces the energy required compared to alternative transmission methods while maintaining signal quality.

Inventive Principle:
Principle #29Pneumatics and hydraulics

Solution Approach 2:

By changing the physical parameters of the screen assembly (increased diameter and surface area), the system optimizes pressure pulse generation efficiency, reducing the energy input required to achieve reliable data transmission signals.

Inventive Principle:
Principle #35Parameter changes

Applied Scientific Principles

This section explains which scientific principles are used to turn an abstract innovation direction into a practical engineering solution.

Function Achieved in This Case

The solution reduces the energy needed for data transmission, increases the efficiency of mud pulse telemetry, and simplifies maintenance by using hydrostatic pressure and a more efficient screen design, thereby enhancing the cost-effectiveness and reliability of MWD operations.

Implementation Method 1

A mud pulse telemetry valve assembly with a flow restriction member, control valve assembly, and pilot valve assembly that utilizes hydrostatic pressure to reduce energy requirements for data transmission

Methodology Applied
Scientific EffectHydrostatic pressure: Pressure Gradient

Data Source

PatentUS11739633B2Mud pulse valve
Publication Date: 2023.08.29 BENCH TREE GROUP LLC
  • US11739633B2 patent drawing
  • US11739633B2 patent drawing
  • US11739633B2 patent drawing

AI summary

A mud pulse telemetry valve and method including a flow tube having at least one upper hydraulic opening extending from an inner surface and at least one lower hydraulic opening extending from an inner surface, a flow restriction member positioned in the flow tube and defining an orifice, an orifice housing connected to the flow tube and supporting the flow restriction member, and a screen defining a flow path from a first end of the screen to the orifice. The orifice housing has at least one inlet port in fluid communication with the upper hydraulic opening upstream of the flow restriction member, and the screen has a plurality of filter openings positioned between the flow path and the at least one inlet port. The mud pulse telemetry valve further has a control valve assembly and a pilot valve assembly.